0508-EngineeringReport
SOL: 07
Crew Engineer Name: Walter Orson Lazo Pazce
Diesel – Full, 100%
Propane – 75%
Gasoline (5 Gallon containers for ATV) – Actually we have 9 gallons
Water (trailer) measured in cm from the bottom– 50 centimeters
Water (static) measured in cm from the top – 52 centimeters
Trailer to Static Pump used – 0
Water (loft) – Static to Loft Pump used – 86
Water Meter: 0.45
Atv # Oil Checked: Ok
Atv # Fuel Used Gals: 0
Atv # Tires Status: That’s ok,
Atv # Hours Used Day: 0 hours
Atv # 0
Notes and Comments: Not yet
Summary of Engineering activities: The work of the team today was:
Elizabeth Centurion: Check the two flower pots of the drip autonomus system. She tested the pots indoor, in the HUB.
Orson Lazo: Does the four and final EVA`s for test the electrodes in the chest. Repair the 3D Printer Cube model for our and other crews.
Marcos Bruno: Build and repair different components for a better function of his rover robot.
Celeste Balladares: Corrected the mistake of the serials communication ports of the arduinos. An arduino send dates and the other arduino receives dates.
Nolverth Huaman: Support the EVA`s of the crew engineer. Wait the results of his samples.
Luis Ibañez: The computer design in the CFD program (Computer Fluid Dynamics) of the HUB advanced in 70%. Tomorrow elaborate the EVA`s.
Jeel Moya: Obtained results in the experimentation: he found bacteria in the clothes of the team.
Questions and Concerns to Mission Support: The leaking water is controlled.