1211-EngineeringReport

Engineering Report

Date: Dec 11th 2015

Crew Engineer Name: Ilaria

Diesel – 67%

Propane –50 %

Gasoline (5 Gallon containers for ATV) – 5

Water (trailer) measured in cm from the bottom– full

Water (static) measured in cm from the top – 26 cm

Trailer to Static Pump used – no

Water (loft) – 6

Static to Loft Pump used - yes

Water Meter:

Atv # Oil Checked: 0

Atv # Fuel Used Gals: 0

Atv # Tires Status: 0

Atv # Hours Used Day: 0

Atv # Notes And Comments: 0

Summary of Engineering activities:

Wifi problems even during late night. Could you please double check and let me know?

Too many mouses around...it is not hygienic.

Questions and Concerns to Mission Support: