418-CommanderCheckInReport

Commander CheckIn Report

04/18/2014

Jorge Mírez

Crew Physical Health:

All are well.

Eva Depart Time:

1000 h

Eva Return Time:

1200 h

Narrative Of Field Mission Results:

Many photos, lichens of differents colours.

Eva Depart Time:

Eva Return Time:

Narrative Of Field Mission Results:

Eva Depart Time:

Eva Return Time:

Narrative Of Field Mission Results:

Eva Depart Time:

Eva Return Time:

Narrative Of Field Mission Results:

Eva Depart Time:

Eva Return Time:

Narrative Of Field Mission Results:

Hab Maint:

Rep Sched:

Tomorrow Plan:

EVA.

1400 h - 1500 h Diego, Luiggi and Adolfo will work in project of Diego Guillén.

Normal Rutine

Adolfo will continue his procedures in the quinoa's crop .

Luiggi continues his work as engineer and also continues making

WaterFlow project details. This project is working with Diego.

Diego continues in his project about trekking poles and working on

software of image processing and the afternoon he has a EVA with

Luiggi and Adolfo tomorrow.

Jorge will work the whole day in building of backpack (ventilator

system, electrical system), and do improvements in the bicycle and repair

the spider robot.

Inventory:

Support Req:

Miscelleneous:

There were many tourists at morning and in the afternoon near the MDRS.

In my project (ergonomic backpack [Jorge]), the accessory spider robot

failed during battery charge due to high temperature. We will find out

how it is operating tomorrow.