NEW: MFPs being replaced Thursday, June 23rd!

Post date: Jun 23, 2016 2:52:50 PM

All MFPs are being replaced one at a time beginning 6/23. The MFP on the 4th floor is being retired. The Omega panels (to swipe and release jobs) will be replaced on June 28th with an embedded software in the new MFPs to print jobs.

One major benefit to us is that these devices will have more memory - which should mean that large file size jobs should print out more quickly.

We will provide any training that is needed once they're installed, but the features should be mostly the same. One main difference will be that a card will be required to swipe to use the scan to email feature. We are working on possibly having dedicated cards at the LSD for visitors to use to swipe and email. I'll update once this is decided.