CommanderCheckIn Report
01/19/2013
Angelo Vermeulen
Crew Physical Health:
All are well.
Eva Depart Time:
14:23
Eva Return Time:
15:52
Narrative Of Field Mission Results:
First field test of Clearpath Husky rover in the vicinity of the hab. Followed by an ATV trip straight north, towards dried up river bed. Distance travelled was 14.6 kms
Eva Depart Time:
Eva Return Time:
Narrative Of Field Mission Results:
Eva Depart Time:
Eva Return Time:
Narrative Of Field Mission Results:
Eva Depart Time:
Eva Return Time:
Narrative Of Field Mission Results:
Eva Depart Time:
Eva Return Time:
Narrative Of Field Mission Results:
Hab Maint:
Part of the engineering checks and reporting were offloaded to two other crew members. Routine checks of water, diesel and propane. Water loft tank was filled up three times. One railing of the staircase was unstable and was fixed today. We looked for a loose floor panel as indicated by mission support to get access to the toilet plumbing. However no such panel was found. We will be asking for more precise instructions. Routine cleaning chores were done in the hab.
Rep Sched:
-
Tomorrow Plan:
Low activity day (sleeping in and individual breakfast, no HI-SEAS tests, no EVAs). Most crew members will us this time to catch up with personal research. Possibly movie screening in the evening.
Inventory:
-
Support Req:
Instructions for access to maintenance area and plumbing check.
Miscelleneous:
Hygiene monitoring was started today using luminometry and bacterial count.