Final Advanced Independent Project 2018
Assignment: Take an idea you and make it the best written, directed, shot, produced and edited story you have ever done. Based off the idea of a story: “A character that wants something and overcomes conflict to get it.”
Due: Take a story you have written in writing workshop or have seen personally or have always wanted to try and create a digital short between 2-10 minutes for the school community to enjoy at Best of New Media.
Goal: To work the hardest you have worked on a project and take what you have learned about the production process and create something you can look back on with great respect. Bite off something challenging, but do-able, and push yourself in your storytelling ability by directing, sound designing, lighting and building characters that are compelling. Take the experience gained throughout the year to make your production stand out at Best of New Media.
Friday April 20- Introduce the project the specific goals of the project
Monday April 30- shoot the boat races as a class
Tuesday May 1- watch through more examples and work on TPP
Wednesday/Thursday May 2/3- deliver Topic/Pitch/Proposal in class to the camera and continue to develop ideas
Friday May 4- Revise TPP, created Production Schedule
Monday May 7- Shot Sheet below
Shot Sheet Example- SHOOT 3 TIMES AS MUCH
Wednesday May 8- May 18 Shooting video
Wednesday-Thursday May 16-17 Rough Cut Critique- 50% in the timeline
Friday May 18- Media Literacy Day
Monday May 21- Post Production editing
Tuesday May 22- editing
Wednesday/Thursday May 23-24 Rough Draft Peer Critique- 90% completed
Friday May 25- Media Literacy Day
Tuesday May 29- FINAL DRAFT DUE AT 9pm
Wednesday/Thursday May 30-31- Watch and critique final projects
Friday June 1- Finalize feedback and upload to lfhsnewmedia.com
Saturday June 2- Best of New Media 7pm at Gorton
Monday June 4- Final uploading
Finals- work on Digital Portfolio video reflection- deadline end of your class period
Rubric-
Pitch-Proposal fully developed and updated 50 points
Production Schedule- updated 50 points
Shot Sheet- fully developed 50 points
Production shooting 50 points
Rough Cut Critique deadline- 50% in the timeline 50 points
Rough Draft Peer Critique- 90% and feedback for 5 others 50 points
Final Project Deadline- 100 points