AP Final Project- Spring 2011
Advanced Independent Project- Telecom- Video Production
Lake Forest High School
Assignment: Take an idea you and make it the best written, directed, shot, produced and edited story you have ever done.
Due: Take a story you have written in writing workshop or have seen personally or have always wanted to try and create a digital short between 2-10 minutes for the school community to enjoy at Best of Telecom.
Goal: To work the hardest you have worked on a project and take what you have learned about the production process and create something you can look back on with great respect. Bite off something challenging, but do-able, and push yourself in your storytelling ability by directing, sound designing, lighting and building characters that are compelling. Take the experience gained in Final Cut Pro and go to the next level in Soundtrack, Motion, or Color to make your production stand out at Best of Telecom.
Monday April 18- Introduce the project through hearing from Senior's experiences from last year, brainstorm ideas
Tuesday April 19- show examples of previous projects
Wednesday April 20- watch more examples, work on TPP
Thursday April 21- deliver Topic/Pitch/Proposal in class to the Kodak and begin to develop ideas over the long weekend
Monday April 25- revise TPP in class and begin scripting
Tuesday April 26- Introduce music video scripting on Scripped.com
Monday May 2- Finish music video script on sites for critique
Tuesday May 3- Class Critique on scripts among those working on AP project in Scripped.com
Wednesday May 4- Work on Shot Sheet based off completed Music Video Script
Shot Sheet Example- SHOOT 3 TIMES AS MUCH
Thursday May 5-
Begin Production Schedule on Google Calendar
Friday May 6-
Finalize all Pre-Production before shooting
Production Process:
Monday May 9- Friday May 13- Production shooting/editing
Post- Production Process:
Monday May 16- Production shooting/editing
Tuesday May 17- Rough Cut with Mr. Douglass
Wednesday May 18- Production shooting/editing
Thursday May 19- Rough Draft Peer Critique
Friday May 21- Production shooting/editing
Monday May 24- Post Production editing
Tuesday May 25- editing
Wednesday May 26- FINAL PROJECT due to DMT projects folder
Thursday May 27- Watch and critique final projects in the DMT
Friday May 28- Final work and uploading it to tele.com
Tuesday May 30- Final work on Digital Portfolio- deadline Friday 3pm
Rubric-
Topic/Pitch/Proposal— 50 points
Script-- 100 points
Shot Sheet 50 points
Production Schedule— 25 points
Rough Cut teacher critique- 50 points
Rough Draft peer critique- 25 points
Final edit due on time-- 100 points
TOTAL PROJECT 400 Points