CP 1st Project- Homecoming Storytelling
Assignment: Showcase a specific part of the high school for the Homecoming Pep Rally audience. You can pick a Varsity sports team, an extra-curricular or a unique way to show as many faces as possible.
Due: 2-3 minute video that utilizes music, text or narration to showcase your fellow students for the Pep Rally as well as for the Athletics web site.
Goal: To show the great abilities you have to shoot video at a professional level and edit together a short piece that tells the story of the event or team you choose.
Pre- Production Process:
Wednesday August 26- Watch behind the scenes and first 30 minutes of Slumdog Millionaire
Thursday August 27- Intro project and then watch first 30 minutes of Commentary
Friday August 28- Watch second 45 minutes of Slumdog
Monday August 31- Watch second 45 minutes of the Commentary
Tuesday September 1- Finish up Slumdog Millionaire with Discussion
Wednesday September 2- Finish up commentaries and special features
Thursday September 3- Topic/Pitch/Proposal development in class
Friday September 4- TPP developed in class for critique
Tuesday September 8- Talk with coach or sponsor with updated proposal
Wednesday September 9- create production schedule
Thursday September 10- create shot sheet
Friday September 11- Finalizing of all Pre-Production work
Production Process:
Monday- Thursday September 14-17 Production Week
Friday September 18- Rough Cut Critique
Post- Production Process:
Monday September 21- Post-Production Editing
Tuesday September 22- Rough Draft Peer Critique
Wednesday September 23- Post- Production Editing
Thursday September 24- Final Draft due by the end of the day
Friday September 25- In-Class final critique
Rubric-
In- Class critique of Slumdog Millionaire 50 points
Topic/Pitch/Proposal- 25 points
Shot Sheet 25 points
Production Schedule 25 points
Production days in class 50 points
Peer Critique Rough Draft 25 points
Final Draft for class critique 100 points
Total 300 points