Assignment: Take an idea you and make it the best written, directed, shot, produced and edited story you have ever done. Based off the idea of a story: “A character that wants something and overcomes conflict to get it.”
Due: Take a story you have written in writing workshop or have seen personally or have always wanted to try and create a digital short between 2-10 minutes for the school community to enjoy at Best of New Media.
Goal: To work the hardest you have worked on a project and take what you have learned about the production process and create something you can look back on with great respect. Bite off something challenging, but do-able, and push yourself in your storytelling ability by directing, sound designing, lighting and building characters that are compelling. Take the experience gained throughout the year to make your production stand out at Best of New Media.
Tuesday April 15- Introduce the project the specific goals of the project, brainstorm ideas
Wednesday April 16- watch through previous projects:
watch these example and critique them in your Google Site under "Final Project"
Thursday April 17- Critique 5 videos from the CTEC Entries in Google Sites then work on TPP
Monday April 21- work on TPP for Tuesday
Tuesday April 22- deliver Topic/Pitch/Proposal in class to the camera and continue to develop ideas
Friday April 25- revise TPP in class and begin scripting on Scripped.com
Monday April 28- Class live production of the Boat Races
Tuesday April 29-30 Work on Script in class
Thursday May 1- Finish script on sites for critique
Friday May 2- Introduce one week class project with the TAs
Monday&Tuesdsay May 5-6 Work on Shot Sheet based off completed Script
Shot Sheet Example- SHOOT 3 TIMES AS MUCH
Wednesday May 7- Begin Production Schedule on Google Calendar
Thursday May 8- Finalize all Pre-Production before shooting
Friday May 9- Finishing Class project by the end of the class period
Monday May 12- Wednesday May 14- Production
Thursday May 15- Rough Cut Critique- 50% in the timeline
Monday May 19- Post Production editing
Tuesday May 20- editing
Wednesday May 21- editing
Thursday May 22- Rough Draft Peer Critique- 90% completed
Tuesday May 27- editing
Wednesday May 28- FINAL DRAFT DUE AT THE END OF THE DAY
Thursday May 29- Watch and critique final projects in the DMT
Friday May 30- Final work and uploading it to lfhsnewmedia.com BEST OF New Media!
Monday and Tuesday June 2-3: Final work on Digital Portfolio- deadline Friday 3pm
Rubric-
Topic/Pitch/Proposal— 50 points
Script-- 50 points
Shot Sheet 25 points
Production Schedule— 25 points
Rough Cut teacher critique- 25 points
Rough Draft peer critique- 25 points
Final edit due on time-- 100 points