XR 558

 Pacific National

XR 558 was the second XR to be built new by Pacific National. It is currently on Broard Gauge (BG).

XR558 and XR555 wait for the signal to proceed at North Geelong C box 26/4/2010.

XR558 leads G539 on a PN grain at North Geelong C box on the 27/11/2011.