2017 Projects
Mjolnir - my first prototype "fast" wing...appropriately named after Thor's hammer
Completed on 12/31/2017
RS90 - my first scratch built quad (retired)
Completed on 12/11/2017
Clover - I wanted a smaller version of the blue noodle to see if I can get the same stable flier in a smaller form. Read on and find out how it performed...
Completed on 8/12/17
Strawberry Strudel - same design as the Orange sherbert, but a lot stronger internally. Incorporates all the lessons learned from the weaknesses of the Orange sherbert and added a mount for a fpv camera.
Completed on 8/9/17
Orange Sherbert - my new test platform for different motor combinations.
Completed on 8/4/2017
Blue Noodle 1000mm - back to larger planes to get a better FPV platform
Completed on 7/13/2017
Micro wing v5 - same wing as v4, except with a lot more power
Completed on 7/7/2017
Traxxas 1/10 Summit - Brushless conversion
Completed on 6/29/2017
Micro wing v4 - increased sweep for more stability and back to lighter electronics
Completed on 6/25/2017
Micro wing with a KF airfoil - more lift and more power? RETIRED
Completed on 6/12/2017
Micro wing V2 - Bigger is better? RETIRED
Completed on 5/29/2017
FMS Alpha Jet - Tail pusher (not EDF)
Completed on 5/22/2017
Dancing Wings Mini Rainbow - Upgraded with a Emax MT1806 2280kv motor (retired - rebuilt using inav)
Completed on 5/16/2017
LKTR 120 - Micro brushless quad
Configured on 5/15/2017
Dancing Wings 800mm Rainbow - A very smooth/stable flyer with a great flight envelope
Completed on 5/8/2017
WLToys F949 brushless conversion - A labor of love
Completed on 4/20/2017
FliteTest Mini Arrow - not really "mini" compared to what I usually build :)
Completed on 4/15/2017
Micro wing V1 - my first scratch built 440mm wing RETIRED
Completed on 4/7/2017
Fly Bear FX-702 chuck glider - My first chuck glider conversion. Turned out really well.
Completed on 3/30/2017
SuperSlo28 - 3d flyer
Completed on 3/2017
TY Model - Lightweight flyer
Completed on 2/2017
DW Mini Wing - My first flying wing (retired - rebuilt using different components)
Completed on 1/20/2017