Ballard UK/Arcola Companies has a requirement to ensure all work equipment is suitable, safe and fit for purpose.
This includes:
Procuring suitable equipment
Equipment documentation
Capturing competence requirements for use
Capturing protective measures and creating SOP for use if required
Ensuring equipment delivered to specification
Servicing, Maintenance & Testing requirements
All staff are required to visually check for damage equipment that they
All Ballard UK/Arcola equipment with maintenance, testing or calibration requirements should be added to HSM184 Arcola Energy Work Equipment Register and its EC Declaration of Conformity stored.
Internal training is provided by HSM068 Work Equipment Safety