Date Calculator Block


Allows setting the value of a date field based on another date field, and the block's configuration.


For example, if a First Notice field (the trigger) is 1/1/2013, the value of a Second Notice field (the target) could be calculated as X number of days after the trigger field date.


Screenshot of the block configuration: