Construction Activities
Construction Activities
Proposed site overview
Project timeline
General Project Construction Sequence
Cost status for crew and machine utilization
Dozers, an important engineering vehicle with a metal blade plate, can be utilized to push large quantities of soil from one place to another. During the land grading project, there will be 8 dozers working on site to finish slot dozing, back filling, and stripping jobs for this project. 3 of them will finish working on Sep. 23 and the rest 5 will be leaving the site on Sep. 24.
Excavators act as the governing construction equipment and will be utilized in this grading project to finish the most of digging jobs. We have assigned 2 excavators working in the same time and they will finish the soil digging before Sep. 27.
Dumping truck will do the soil conveying within the site area and to the disposal station in this project. Considering the busy schedule, 16 trucks will start to dump the needless soil on Sep. 16 and another 4 trucks will join to finish all the disposal on Sep. 27
Crew Injuries
Material & Machines