Introduction





The background of this project is to grade a site that is located on a high school campus. The site is surrounded on all sides; to the north is the campus, to the south is a forest, and on both the east and west sides is a roadway. During the duration of this project the school must continue to run with preferably minimal distractions, while doing the project in a timely matter. The area of site to be graded is ~16700m^2 and the estimated amount of earthworks to be cut and filled is ~8800 and ~3300 respectively.


Through this project our team will efficiently get the job done by implementing the methods explained on the 'Construction Activities' page. We are excited to do this job so that future upgrading can be done to the school to allow for kids to get a better education.