Cost

The total direct cost includes the cost of grading Area 1 and Area 2, in addition to the cost of hauling the excess material off-site. The cost of mobilizing, demobilizing and reclamation is part of the overhead costs. Breakdown of other related costs can be seen in the table below.

Breakdown of Total Project Cost