Crew & Machine Utilization
Crew & Machine Utilization
There will be two crews for this project. The onsite crew will be dealing with earthwork, consisting of one (1) excavator and three (3) bulldozers for consistent productivity. The other crew will be mainly transporting the excess earth away from the project site to the nearest waste facility, located 30 km away. That crew will have one (1) excavator and six (6) trucks.
To operate the equipment efficiently in a safe manner, each excavator will have one (1) operator and (1) helper for assistance.