At A+ Grading, we are very considerate of the wildlife and community that surround our projects, and we want to minimize our disturbance as much as possible
Connection between the north and south campus must be maintained to avoid disrupting the high school's day to day activities. We will install a temporary pathway for students and faculty to use, located just outside of the eastern portion of the site.
To avoid disrupting the school and community, soundproof fence panels will be placed along the surrounding fence to minimize noise pollution from the site.
To reduce the production of dust from our excavation activities, we will dampen the soil with water each day. Also, temporary wash pads will be placed at the site exit to wash down vehicles before they leave.