Click on [Qualitative coverage (Progress Follow Up) Evaluates Qualitative Coverage].
A Report criteria folding panel is displayed. Select a project or a milestone in the drop down list.
Note : selection of more that one project (in the drop-down list of projects) is an option which is set in Squash TM configuration file (squash.tm.cfg.properties). Please refer to Chapter 4 of the Installation guide for further details
3. Click on [Generate]. A level 2 page opens-up and contains two units :
Report criteria
Report board, generated according to the selected project.
Two boards are generated from the requirement coverage by test reports.
The dashboard displays for the selected project :
The number of covered requirements to be tested
The number of covered requirements tested
The total number of covered requirements
Progress percentage
The number of validated requirements
Requirements are sorted by criticality (Critical, Major, Minor, Undefined).
The dashboard displays :
The selected project
The campaign(s) related to the selected project
The iteration(s) related to the selected campaign(s)
The test suite(s) related to the iteration(s)
The name of the requirements
The requirement criticality
The number of test cases sorted by their status (Success, Failure, Blocked, Untestable, Running, Ready)
Different export formats are available :
Dashboard for campaign follow up: .pdf, .html
Test cases list by campaign: .pdf, .html
Select the export format in the combo box
Click on [Export]