A new documentation is available for Squash TM 2.0 and later versions, check it here
Click on [Requirement Coverage By Tests (Progress Follow Up) Requirement Coverage By Tests].
The Report Criteria foldaway opens.
Select a project or a milestone in the drop-down list and set the relevant option for (requirements) versions management (either all versions or only the last version).
Note : selection of more that one project (in the drop-down list of projects) is an option which is set in the Squash TM configuration file (squash.tm.cfg.properties). Please refer to Chapter 4 of the Installation guide for further details.
3. Click on [Generate]. A page of level 2 opens and contains two panels:
Report criteria.
Report board, corresponding to the defined criteria.
Two boards are generated from the Requirement coverage by tests report.
The dashboard displays for the selected project :
The total number of requirements by project and their distribution according to their criticality and their status.
The requirements coverage by at least one test case (value and percentage)
The table lists the following information :
Selected project(s)
Path of the project
Requirement reference
Requirement name
Requirement version
Requirement criticality
Number of test cases associated with the requirements
Different export formats are available :
Dashboard for requirements' coverage: .pdf, .html
Requirements list by Project: .xsl, .ods, .csv, .pdf, .html.
Select the format in the combo box
Click on [Export]