"MJ's leadership is dynamic and proactive, and can be described as agile: she is not domineering, rather consistently solicits input in order to continually adapt and improve based on available resources." - Thomas Siller, Associate Professor, Civil Engineering, Letter, 2022
Elements of good management, including speaking strategies
“Your job as a leader is to gain perspective by asking questions so that greater opportunities can be created” ~ David Bator, Managing Director, Achievers
Coordinated a professional development retreat for award-winning math teachers with Texas Instruments (TI) through CSU
Lodging, food, and meeting spaces required high-stakes agreements for 5-star lodging
Please see STEM Center Conference
Image Credit: Hyatt at The Ranahan
Water supply project for a rural community just outside the capital of San Salvador
Images credit: EWB-USA
Sample Budget Management and Technical Writing sample
Potable Water Project for community near Bamako, Mali
The goal of this project was to drill a new well in the valley, and then pump the water 1000 feet up and one mile away, to a village of 500 residents atop a mesa. This project failed because of a cultural oversight. The Peace Corps volunteer who brought this project to EWB assumed that the whole village would be on board with the project, as did the Project Manager who initially developed the project. After the assessment trip where 10 of us measured distances and water quantities, the women of the village said they refused to allow the system to be built because that meant their peaceful time of day walking the one mile to the well would be taken away. The village elders could not argue with the women, even when we asked if their girls of the future would be denied education because of their fate of duty to the community. A desert community in Africa had several variances in communication that we did not foresee.
Images credit: EWB-USA
Multiple (15+) water supply, sanitation, and potable water projects near La Lima, Honduras
In the fall of 2006, my team was invited to La Lima, Honduras to assess a sanitation project. Since Hurricane Mitch in 1998, and subsequent climate change, plantation companies had been moving out of Honduras, leaving many jobless and without the money to improve their infrastructure. The mayor hosted out team and then surprised us with 17 other projects in the area that needed attention: several water runoff issues, school repair, church reconstruction, multiple sanitation projects, and three bridges. I continued to assist with our sanitation project and built designs for a tilapia farm, which was a growing solution at the time, and submitted the other 17 projects as potentials for which other EWB chapters could apply and manage.
Assisted with over 250 chapters in getting projects approved through national office logistics and engineering requirements
Scheduled and facilitated meetings
Coordinated engineering expertise
Screened projects for engineering design compliance
Pushed projects through pipeline of requirements for assessments, design, construction, and evaluation
Collaborated with PEs and attorneys on evolving design and legal concepts
Willows Campground and Perception Park