Stranded on an island on Stillwater, 2 people went back for the Ranger who did manage to save everyone - but not without some Barney Fife police work. Those left behind went into Lord of the Flys mode.
TRACY CAN ENTER HER STORY HERE>>>
It served well for 45 summers! let me know if you sailed on it... devinhollands@gmail.com
----- Original Message -----
From: Devin Hollands
To: leaders@unirondack.org
Sent: Sunday, October 17, 2010 6:41 PM
Subject: tour of camp for foundation planning
RUSS- for your committee - can be refined as needed - added to..
2010 The Unirondack campus is an ever evolving home for our wonderful camp. The Unirondack foundation will allow us to maintain the current campus as well as meeting goals of our program as it calls for new or improved facilities and infrastructure.
Tour of current facilities with goals for the future:
Gilman houses our kitchen and dining hall and is under renovation as a keystone to our foundation drive. A larger open floor space has been created with a view of the beautiful woods on the south end of the building. The walls which are currently bare stud walls will be covered with attractive pine boards. New windows are needed on the Lake side of the building. Continued pruning of brush to allow views of the lake is a necessity to truly enjoy our spectacular views from Gilman. An outdoor deck will extend off the south end of the building with a commanding lake view. A new wood stove is needed for the 2011 season to heat the larger dining hall. $20,000
The kitchen in Gilman could use some upgrades in the exhaust, lighting, dish system and walk-in cooler - commercial equipment kept in top form is a great expense witch the foundation will assist with.
$30,000
Sweet dormitory:
Sweet is an original camp building built in the 1920s and has been maintained over the years and modernized to some degree. New bathroom renovations are currently needed and new roof. Fire safety is an ongoing concern and foundation funds might help in going to the next level in fire safety - possible visible alarms or some other system... as the building has 7 sleeping bunks on 2 levels it is critical that any emergency within the building is communicated to all inhabitants. To extend the season safely some rewiring will take place for dedicated outlets to allow safe portable heaters to be used without overloading the current wires.
$20,000
Lodge
The lodge has experienced recent upgrades after 30 years of hard use. Continued work needs to take place to keep it functioning at high levels.. New wood stove, new doors, new roof and chimney work will keep the lodge in good shape
-- $20,000
Showerhouse
The showerhouse was upgraded in 1996 but is in need of a complete make-over.. ceramic tiles replaced in 1996 are falling off the shower walls... due to the very rough winter where water freezing and tiles do not go hand in hand... To make the shower house more attractive = new hotwater heater is needed for higher capacity, user friendly showerheads to allow nice pressure will be installed.., Tile in the showers to be replaced. the Cinderblock walls can be covered with beautiful wood in the common areas, and a ceiling also installed which will both add to the beauty and keep the warmth in during the spring and fall. New toilets and dividers are needed and new shower doors, shelves wood add some nice touches... The cold cement floor needs to be covered in a method that allows easy cleaning....
$36,000
TOP OF SHOWERHOUSE - with larger staff and more adult senior staff members personal housing other than group bunk style is needed. One option being studied is to build UP over the showerhouse so not to use any of the camps limited and precious land. A multi-room housing unit can be easily constructed over the cinder block walls of the showerhouse.. and should be done in conjunction with the showerhouse renovations planned as much as possible...
$75,000
Overlook
Overlook is another original building and could use some additional upgrages to make it more livable.. new windows, improved bathrooms and other upgrades
$16,000
Zigmund
A camper cabin that needs to be enlarged to meet state code for housing campers, a new bathroom is also planned, this building would still be able to be split for family use, while retaining the one large open space the campers love about the building currently. Utilizing the water heater from the Chadwick project this bathroom could also include a shower facility option.
$24,000
Chadwick
Also a camper cabin which will be rehabilitated removing the block of bathrooms the divides the cabin, thus opening the cabin into one large bunk room, the ceilings can be slightly peaked to allow more spacious feel and the hardwood floor sanded and refinished. A new bathroom wing will be built outside the current footprint extending off the back wall, The campers can walk into an open sink room to brush teeth or wash hands.. and then enter through the bathroom door for toilet. A shower would allow spring fall users to better enjoy this cabin which is the most distant from the shower facility.
Water front
The waterfront upgrade has been going on for a few years and will continue with a left rock break-wall to help retain our new sand beach, possible new Left dock similar to the one on the right. A screened siting deck is also an option for hanging out in this most beautiful point on our campus.
$4,000
Stevens Performing Arts Center new chairs, tables and lights will help our new center reach its potential. This project is the first major investment that the foundation earnings will help partially finance. Woodstove is possible option
$4,000
Boathouse Art shop rehab
To recreate a beautiful Adirondack boathouse is one of our dreams. Our old boathouse rotted and was removed in 1978 and nothing at all has been done to it since. The most treasured space – our art shop sits on cement pillars over what was the boat house. It is the dream to rebuild under the current art shop creating a beautiful boat head with actual covered boat docks. This is what we had and should recreate. The art shop and be raised up, new roof installed and new siding to replace the black shingles there now. A large roof covering docks which extend into the water will allow easier access to our lake for all campers. Rather than drag the boats down the shore you walk out and step in off the dock. We will start working with the Park association about regulations for rebuilding our lost boathouse and then working on design concepts for this exciting project.
$60,000
LOW ropes course
We are planning a low ropes course to be installed as soon as design work and funding is accomplished.. This will give an extra dimension to our programming that the campers will love and benefit from.
3,000
Devin Hollands