but many did come back in a new form
but many did come back in a new form
Larger addition was built in 2007 based on this same concept
B/G committee vote to place it in current location - not central
Proposed building across driveway from Zigmund
To be located on shores edge near Chapel area
All was fine until the end of season the director tipped tank to pump remainer into truck and the rust clogged the fuel filter on way back to Rochester.
ideas to fix up the old play yard - sometimes things were done to make it usable but often not
Idea was vetoed by Devin Hollands - because pumps fail - pure gravity system other than Randy and Artshop was built by drilling pipe from Gilman to hillside and Overlook to hillside. Woods cabins were to be pumped also but that system was not connected to the leach field even though pipes are in place in leach field for the woods cabins.
buildings and grounds = we are planning Chadwick renovation.... possible 2nd floor for staff housing is new idea...
Campers LIKED the square layout rather than an L shape so everyone was equal and could see everyone. So we stopped adding the Extensions like Woodman and Smith received.
Bartowsik plan eventually built INSIDE existing Gilman by the builder Paul Wright