Text from the Village Web Site building permit application pdf file has been added here for text searching.
*** NOTE ***
The Village Building Permit form needs to be corrected. It still lists Niagara Mohawk on the form. Niagara Mohawk was purchased by National Grid in 2002. "Section 4 continued" is listed on their form as following section 6. Page numbers are incorrect. The sections are listed in the correct order below.
Do not use this web page as an application.
Use the form found on the Official Village of Ilion Web site. Building Permit Application
http://ilionny.com/qdynamo/download.php?docid=419
The pdf form file has been included in the files section below.
Ilion Fire Department
Code Division
1 Central Ave. Ilion, N. Y. 13357
315-894-6048
Plans required __ yes __no
Reviewed by
_________________________________________
and
_________________________________________
Section(4) cont. Addition, New Structure or Structural repairs
Footers:
Depth of footer from finished grade ________
Depth (Min 10") ________
Width ________
Rebar: yes or no
Number of Rods ________
Thickness ________
Foundation Wall:
Block; 6" 8" 10" 12"
Durawall: yes or no
Every ____ courses
Poured Wall Width ________
Rebar: Vertical ______ Horizontal________
Beam:
Steel
Wood
Micro Lam
Other
Length ________
Height ________
# of Pilasters ________
Deck:
Joist Size ________
Spacing ________
Plywood Size ________
Bridging ________
Walls:
Stud Size ________
Header Size ________
Wall Height ________
Sheathing Size ________
Stud Spacing ________
Interior Walls:
Stud Size ________
Header Size ________
Wall Height ________
Spacing ________
Ceiling Joist:
Size ________
Spacing ________
Roof Rafters:
Pitch of Roof ________
Rafter Size ________
Rafter Length________
Sheathing Size________
Collar Ties: yes or no
Type of Finish roof ________
H Clips: yes or no
If anchoring to existing structure, explain fastening point and method
________________________________________
________________________________________
________________________________________
________________________________________
Trusses:
yes or no
Spacing ______
Engineering paper work: yes or no
*** ALL TRUSSES AND RAFTERS MUST MEET A 40 LB SNOW LOAD
Insulation:
Foundation ______ R-value
Walls ______ R-value vapor barrier ______
Ceiling______ R-value vapor barrier ______
Setback Requirements For Pools and Accessory Buildings
Zone R-3 Sides 10 Feet Rear 25 Feet
Zone R-6 Sides 7 Feet Rear 30 Feet
Zone R-10 Sides 7 Feet Rear 30 Feet
If setback requirements cannot be met, a variance MUST be obtained through the Codes Office or Zoning Board.
Section(5) Cost:
Cost of Improvement $________
a) Electrical $________
b) Plumbing $________
c) HVAC $________
d) Other $________
Total cost of project $________
This building permit is issued with the expressed agreement that said shall hold the Village of llion harmless and shall indemnify said Village for any and all causes of action arising out of any engineering or architectural services provided by or contracting services provided by
_________________________________________, in as much as certified/stamped prints are not submitted with this application.
This permit is for the intended occupancy use only. Any proposed change in occupancy of the above structure, will require approval from the Codes Division prior to any change.
** All electrical inspections must be done by a 3rd party independent inspector and a copy of these inspections shall submitted to the Codes office upon completion of each inspection.
Variance required: yes or no
Type of Variance: use, area, flood, other
Variance ____ approved ____ denied
Signature of Applicant _________________________ Date___________
Approved by _________________________ Date___________
PERMIT FEE $ ___________
Section (6) Demolition work only:
lnsurance Certificate Attached: yes or no
Gas Disconnected on ______ by __________________ Niagara Mohawk
Electricity Disconnected on ______ by__________________ Ilion Light Dept
Water Disconnected on ______ by__________________ Ilion Water Dept
Sewer Disconnected on ______ by__________________ Ilion Public Works Dept
Permission for a Routine Variance within the Village of Ilion
I _________________ owner of the property located at _________________ with lot lines bordering _________________which is owned by
_________________, grant permission to _________________ for construction of a _________________, closer to my property line than is allowed by the Village of Ilion setback requirements and in accordance with sec. 250-39(D)(2). This variance shall pertain only to the above-mentioned project.
This agreement is between the two above mentioned parties and is a variance for the Setback requirements only.
The Village of Ilion does not survey or interpret property line locations or land deeds
Name: _________________
Date: _________________
* Both parties should keep a copy of this variance with other real estate documents for future reference.
BUILDING PERMIT APPLICATION
Permit number___
Please complete all necessary sections pertaining to your project, stamped Architect/Engineer prints may be required prior to approval of building permit.
Section (I) Project Location:
Project Address:__________________
Zoning District _______________
Tax Map #_____ - ____ - _________
Cross Streets
_______________ and _______________
Flood Zone: yes or no
Date work to begin ____________
Date of completion ____________
Section(2) Applicant:
Applicant Name: _____________________
Phone #__________________
Applicant Address:________________________
Applicant is
__ owner __ agent __ builder__ other
(If different from Applicant)
Owner's Name: _____________________
Phone #__________________
Owner's Address:________________________
Section (3) Type of Improvement :
__ New Building
__ Repair
__ Roofing/Siding
__ Alteration
__ Pool
__ Fence
__ Addition
__ Sign
__ Demolition
__ Electrical upgrade
__ Plumbing
__ Solid Fuel Device
Brief description of work:
_________________________________________
_________________________________________
_________________________________________
_________________________________________
Assessed value of property $ ____________ (Demo only) (Complete section 6)
Section (4) Project data:
Construction type:
__ Wood Frame
__ Masonry
__ Steel
__ Other
Existing Occupancy: ________ Intended Occupancy: ________
Dimensions of exiting structure:
front ________ rear ________depth________height________
Dimensions of new structure:
front ________ rear ________ depth________ height ________
Square footage of new structure ________sq./ft.