Post date: Sep 17, 2011 1:48:14 AM
Message from Larry Dutton:
As you probably have noticed the sidewalks were repaired on Wed. the 14th. Jason, the owner of Gahan Const., recommended we not drive on them for 9 days, so we have left the barrier tape up on sidewalks in front of driveways. The new sidewalk panels are ready to be walked on and therefore we have taken down the barrier tape around those panels not in front of driveways. All panels may be walked on. We have two folks that have their entire driveways blocked and we really want to apologize for their inconvenience and thank them for their cooperation.
When the sidewalks are ready to be driven on we will take down the barrier tape. Thanks again.