Post date: Apr 18, 2018 10:18:1 PM
The headgate was opened this weekend and it took the water a couple of days to flush out the lateral ditch to get to our holding tank. Today we pressure tested the system and everything looks great.
The transducer for the VFDs (variable frequency drives) has to be replaced and installed. We do not have a time frame for that yet, but we will keep you posted.
It looks like very few properties were flooded today. Please make sure your main valves are closed until we give the go-ahead to start watering because we will be testing the system again soon.
Thank you!