LABORATORY
PARAMETER A: LABORATORIES, SHOPS/FACILITIES
SYSTEM – INPUTS AND PROCESSES
S.2. The laboratory layout conforms to acceptable standards (RA 6541 National Building Code of the Philippines/PD 856 “Code of Sanitation of the Philippines) and to particular needs of the program.
HRM
S.2.2.1. housekeeping;
S.2.2.2. Food preparation and service; and
S.2.2.3. Bar management;
TOURISM
S.2.3. Students have separate laboratory rooms for the major areas:
S.2.3.1. Travel agency; and
S.2.3.2. Front office.
S.8. The Kitchen Laboratory has facilities for both hot and cold preparations as well as baking activities. It should be subdivided into completely equipped unit kitchens.
IMPLEMENTATION
OUTCOME/S
PARAMETER B: EQUIPMENT MATERIALS
SYSTEM – INPUTS AND PROCESSES
IMPLEMENTATION
OUTCOME/S
PARAMETER C: MAINTENANCE
SYSTEM – INPUTS AND PROCESSES
IMPLEMENTATION
I.3. The inventory of laboratory, facilities and equipment is systematically and periodically conducted.
I.7.5. General education laboratory;
I.7.5.2. Speech laboratory; and
I.7.6. Other (please specify)________________.
OUTCOME/S
PARAMETER D: SPECIAL PROVISIONS
SYSTEM – INPUTS AND PROCESSES
IMPLEMENTATION
OUTCOME/S