Phase D Inspection Results
Group 1) Sample Plate Inspections Done!
Task Description: Inspect the sample plate dimensions and confirm that it has the intended flight samples and thermistor.
Completion: March 17, 2022
Team Member: Ali
Resources Required: Assembled Flight Sample Plate
Verification Activities: V-PLD-0011, V-PLD-0031, V-PLD-0042, V-PLD-0051, V-PLD-0061, V-PLD-0721, V-PLD-0291
Pass Criteria: Flight sample plate contains 24 flight samples, the gnomon, and one thermistor, contains no adhesives
Detailed Description:
Count the number of samples embedded within the sample plate assembly.
Confirm that the thermistor has been mounted to the sample plate.
Inspect the sample plate and confirm that it does not use adhesives near the samples.
Results:
It can be confirmed that:
There are 24 samples (including cal targets) embedded within the sample plate assembly. The sample plate components are within tolerance.
The thermistor has been mounted to the back of the sample plate.
There were no adhesive near the samples.
Figure 1: Payload flight sample plate assembly
Figure 2: Sample plate thermistor
Group 2) Camera Mounting Angle Inspection Done!
Task Description: Verify that Payload measurements are taken at a 30 degrees +/- 3 angle to the samples
Completion Deadline: July 14, 2022
Team Member: Ali
Resources Required: Calipers, angle calipers, camera-Payload Control Board assembly, Sample plate as mounted to the upper payload module
Verification Activities: V-PLD-0131
Pass Criteria: The sum of the camera mounting angle and sample plate mounting angle is 30 degrees +/- 3 degrees.
Detailed Description:
Verify that Payload measurements are taken at a 30 degrees +/- 3 angle to the samples by:
1. Measure and record the heights of each of the PCB mounting posts on the Payload Upper Module.
2. Measure and record the heights of each corner of each payload camera as mounted on the Payload Control Board
3. Calculate the resulting angle between the normal vector at the centre of the camera board and the normal vector at the centre of the Payload Upper Module.
4. Measure the angle between the sample plate and structure.
5. Confirm that the sum of the camera mounting angle and sample plate mounting angle is 30 degrees +/- 3 degrees.
Results:
We simply confirmed the sum of the camera mounting angle and sample plate mounting angle is 30 degrees (+/- 3 degrees) by measuring the angle between the sample plate and the shell.
Group 3) Payload Weigh-ins
Task Description: Weigh the various Payload Flight Components
Completion Deadline: Ocrober 12, 2021
Team Member: Ali
Resources Required: digital scale, sample plate assembly, camera-Payload Control Board assembly, sample plate rear supports
Verification Activities: V-PLD-1790, V-PLD-0635
Pass Criteria: No single component has a mass greater than 250 grams and the sum of all masses is under 588 grams
Detailed Description:
Weigh and record the mass of each payload component (for this activity, the sample plate assembly and camera-Payload Control Board assembly without rear supports are considered single components).
Calculate the sum of all masses.
Results:
It can be confirmed that payload components have the following masses:
The sample plate assembly (without thermistor): 92.2 g
Payload upper shell: 139.5 g
Payload lower shell: 160.1 g
Solar deployment assembly: 48.24 g
Payload control board:
Group 4) Payload Control Board Inspection
Task Description: Inspect the Payload Control Board
Completion Deadline: 7-May-2021
Team Member: Ali
Resources Required: Payload Control Board
Verification Activities: V-PLD-0731
Pass Criteria: the payload control board has a thermistor mounted to it
Detailed Description:
Inspect the flight payload control board to verify that the payload control board has a thermistor mounted to it.
Group 5) Payload Surface Finishing Done!
Task Description: confirm that all visible payload structural components are black anodized.
Completion Deadline: 24-May-2021
Team Member: Ali
Resources Required: sample plate assembly, sample plate rear supports
Verification Activities: V-PLD-0685, V-PLD-1051
Pass Criteria: Confirm that all parts that are to be black anodized, as indicated on the Payload ICD, are black anodized and that no parts have sharp edges.
Detailed Description:
Inspect all aluminum payload components and confirm that they are anodized as indicated on the Payload ICD.
With your thumb in a clean room-safe glove, carefully pass it over all outer part edges and confirm that none of these edges are sharp enough to cut through the glove.
Results:
It can be confirmed that:
All visible payload structural components are black anodized (except gnomon which has a gold coating)
No components have sharp edges.
Group 6) Gnomon Inspection Done!
Task Description: Inspect the flight gnomon and confirm that it is less than 28 mm by 28 mm and has a matte finish.
Completion Deadline: 19-May-2021
Team Member: Ali
Resources Required: Flight gnomon, calipers
Verification Activities: R-PLD-0320, V-PLD-0231
Pass Criteria: The gnomon is less than 28 mm by 28 mm and has a matte finish.
Detailed Description:
Confirm that the gnomon is located on the geological sample plate and is less than 28 X 28 mm.
Inspect the flight gnomon and verify that it has a matte surface finish.
Results:
It can be confirmed that:
Gnomon dimension is less than 28X28 mm and has matte surface.