Search this site
Embedded Files
Skip to main content
Skip to navigation
Iris Project
Home
Project Management
Risk Registry
Team
External Action Items (RID)
Weekly Meetings
STAR Lab Tool Check-Out List
Document Control
Featured Reading
Document Registry
Part Number Registry
Long Lead Items List
Requests for Deviation
Design Page Template
ICD Template
Analysis Template
Verification Template
Inventory Management
Operations
Pre-CDR Presentation
Systems Engineering
Assembly Plan Template
Requirements Introduction
Requirements Organization and Nomenclature
Requirements Verification
Requirements Registry - Valispace
Valispace Instructions
Requirements Page
Requirement Details
Verification Activities
Verification Reports
Template Test Plan
ADCS Verification
AIT Verification
Battery Vibration Testing
CDH Verification
Comms Verification
AX100 Qualification + Documentation
Comms Test Plans
Comms Verification Report
Comms Verification 0001-0101
Comms Verification 0110-0300
Comms Verification 0270-0440
Comms Verification 0450-0620
Comms Verification 0621-0720
COMS Antenna Door FEA
Ground Station Verification
Ground Station Verification Activities Report
Ground Station Test Plan
Payload Verification
Payload Analysis
Finite Element Analysis (FEA)
Payload Failure Modes Analysis
Sample Shadow Analysis
Gnomon Pattern Calculations
Payload Component Radiation Review
Payload EM Short Root Cause Analysis
Payload Camera pins problem
Payload Test Plans
Sample Friction Test Plan
Payload Vibration Test Plan
Payload EM Control Board Test Plan
Sample Plate Shadow Test Plan
Camera Pixel Test Plan
Camera UV Exposure Test Plan
Gnomon Shadow Test
Payload Phase D Test Plan
Payload FlatSat Test Plan
Payload Full Spacecraft Level Tests
Arducam Imaging Instructions
Payload Camera Baffle Test
Payload EM Board ICD and Instructions
Payload Coating Instruction
Test Plan Template
Payload Test Results
Sample Friction Test Results
Camera Baffle Test Results
Payload EM Board Test Results
Payload Vibration Test Results
Sample Plate Shadow Test Results
Camera Pixel Test Results
Gnomon Shadow Test Result
Phase D Test Results
Payload FlatSat Test Results
Payload Verification Results
Payload Phase D Inspection Activities
Verification Matrix and Completed Activities
Phase D Inspection Results
FM Lens TVAC
Power Verification
Power Verification Report
Software Verification
Structure Verification
Structure Verification 0010-0300
Structure Verification 0310-0530
Structure Verification 0540-0780
Structure Verification 0800-1130
Structure Verification 1150-1400
Full Assembly Vibration Test Plan
Full Assembly Vibration Test Result
Thermal Verification Report
Subsystems Design
Science Payload
AIT
AIT Model Philosophy
AIT Deliverables
Phase D Build and Test Plan
AIT FlatSat Plan
FlatSat Jig Assembly Plan
AIT Build Plan
Spacecraft Level Testing and Shipment
Battery Vibration Jig Assembly Plan
Schedule and Budget
AIT Facility and GSE
Shipping Plan
ADCS
ADCS ICD
CDH
CDH ICD
Phase C Test Progress
Final Assembly
Communications
Comms ICD
Test Procedures
Comms Final Assembly
Flight Software
Flight Software ICD
Ground Station
Ground Station ICD
Payload
Payload ICDs
Sample ICD
Camera Support Drawings
Camera Baffle Drawing
Payload Controller Schematics
Sample Support ICD
Sample Plate Rear Support ICD
Sample Plate and Sample Plate Lid ICD
Payload FM board schematic
Payload Flight Assembly Plan
Power
Power Model Philosophy
Power Deliverables
Power Design
Power ICD
Power Analysis
Power Budget
Power design schematics
EPS controller software
Solar Cell Design and Testing
Power Assembly and Testing
Power Shell Assembly
EM Battery Pack
FM Battery Testing
EPS Electronic Boards Testing
Solar Panel Assembly
FLATSAT Testing
Component's Datasheet
Power Assembly Plan
Power Assembly
Structure
Structural ICD Overview
Structural Schedule
Structural Analysis & Testing
Final Assembly Functional Testing and Inspections
Thermal
Thermal ICD
Thermal Analysis
Thermal Testing Phase C
Vibration Interface Plate
Functional tests and Inspection activities
TVAC Test Plan
Harness
Harness ICD
Resources
How to Do Fastener Analysis
How to install Helicoils
How to apply Loctite
Tool Guides
Digital Microscope
Fastener Cleaning Guide
NX Best Practices
Manufacturing Info
Iris Project
Long Lead Items List
Long Lead Item List
Google Sites
Report abuse
Page details
Page updated
Google Sites
Report abuse