Ground Station Verification

Model Philosophy

Describe the different models that will be used in testing. Not all models will be used by every subsystem, but complete it as :

  • Breadboard Model

    • Planned Uses

    • Phases

    • Verification Activities Used in Model

  • Structural Test Model

    • Planned Uses

    • Phases

    • Verification Activities Used in Model

  • Prototype Model

    • Planned Uses

    • Phases

    • Verification Activities Used in Model

  • Engineering Model

    • Planned Uses

    • Phases

    • Verification Activities Used in Model

  • Qualification Model

    • Planned Uses

    • Phases

    • Verification Activities Used in Model

  • Engineering Qualification Model

    • Planned Uses

    • Phases

    • Verification Activities Used in Model

Testing and Verification

Verification of much of the ground station will be accomplished through ground-based tests on communication models. Remaining verification will occur through tests with in-orbit satellites having similar orbital parameters to the Iris mission.

The following will be verified through ground-based testing on communication models:

  1. Unlinking of commands to the communications board.

  2. Downlinking of telemetry data from the communications board.

The following will be verified through communication with in-orbit satellites:

  1. Antenna pointing accuracy.

  2. Tracking software capability.

  3. Automation of telemetry downlinking.

Verification Activities

Ground Station Verification Activities

Test Plan -Archieved

Ground Station Verification Activities