AIT Series
The AIT deliverable items can be divided in 6 branches:
Quality Planning
Change Controls/Configuration Management
Metrology Controls
Process Control
Nonconforming Treatment
Material Review
Control of Temporary Removals
Cleanliness and Contamination Control
Material Control
Subsystem Acceptance Inspection/Certification Reviews
Formal Reviews
Management Reviews
S/C Flight Hardware assembly status log
S/C Flight connectors mate/demate control Log
Thermitors connections status log
S/C MLIs installation status log
S/C Flight Units grounding/bonding status log
S/C Controlled screws log
S/C Flight Mechanisms control log
S/C Flight Hardware storage status log
S/C Non-Flight materials temporary assembling status log
S/C Photography Assembly/Test Operation log
S/C AIT Activities Log
S/C AIT Open points control Log
S/C AIT Non Conformances control Log
S/C AIT Waiver/Deviation/Change control Log
S/C Special Test Request (STR)
S/C Configured Flight & Test Software modification Log
S/C TRB/TRRBs control Log
S/C Flight Battery charge/discharge control Log
S/C Flight Units operation time utilization control log
GSE Equipment Calibration/Certification status Log
GSE Equipment maintenance status Log
GSE / AIT Test Facility Cleanliness/Contamination status Log
AIT Test Facility Grounding / No Break status Log
AIT Materials Proprietary control Log
Equipment Transportation Record
Equipment Operation Log
Equipment Connector Mate/Demate Log
Equipment Non-Conformance History
Review Test Plan/Procedures
Perform Test Readiness Review
Perform Test Monitoring
Perform Test Review
Post-transportation inspection
Performing and documenting necessary inspections
Perform test readiness review and verify if all action items have been closed or dispositioned as “OK to Proceed”
Surveillance and monitoring of all satellite required hardware and software integration/functional testing
Perform Test Review
Assure Program Handling Constraints are clearly identified and complied with integration procedures
Monitoring and ensuring Spacecraft/Payload contamination control procedures are followed
Verification of compliance to procedures and requirements regarding Spacecraft/Payload in preparation for Launch Vehicle integration
Participation in Launch Vehicle Integration Readiness Reviews
Surveillance of Satellite/Launcher testing
Participation in Satellite Flight Readiness Reviews
Flight hardware interfaces, mechanical and/or electrical, are compliant to requirements
Ensure that test equipment, including computer-aided testing techniques and data are validated prior to use and controlled during their use in testing
Current calibration of Electrical GSE
Current proof-load of Mechanical GSE
Cleanliness and contamination control requirements are compliant
Proper and legible identification of the product
Safety requirements are satisfied and potential hazards are identified