This document contains the parts list for Power subsystem and the status of each part.
This document contains:
Part work packages and schedules for Phases C and D
Test plans for Phases C and D
Assembly plan
Ground electrical equipment
Pre-Close-Up Verification Activities
Before the module is closed, the following verification activities must be performed:
Verify that the deployment switches are in an open state and that the battery unit is electrically isolated from the rest of the system.
The document below shows the battery test plan and test report.
Test report for FM batteries
Test report for EM batteries