Indirect labor accounts for time spent on the project that is not included in the direct or incidental labor (e.g., the design engineer’s time for a design build or time needed for a general foreman to plan outages, etc.). Review the Indirect Labor screen:
1. Click the Indirect Labor tab.
2. Review the hours and rates for each of the types of Indirect labor.
3. Double-click the field and enter the needed change.