The Bid Breakdown tab can be used to break our estimates down as required from our customers.
Note:
Bid Breakdown load speed is greatly affected by the number of breakdowns required, takeoff quantity, close-out information, and cost allocations.
Doing Cost Allocations of the different Bid Breakdown categories across the different Closeout Screens, is one of the most important tasks. However, missing an allocation in one of the Breakdowns on one or more of the Closeout screens is a common problem and can easily be viewed with the "Missing Cost Allocation" dialog box.
This dialog box:
Displays a quick consolidated view of all the allocations on all closeout screens
The form can stay open and floating in the application while the user moves between the different screens of the application allocating the missing allocations.
The user has the ability to print the consolidated view