In this cable tray example, 12” tray is taken off and multiple items are added to the takeoff.
1. In Breakdowns: change the Bid Item, Drawing, Area, and Phase as needed. Select Systems – 170 Cable Tray. Select the Takeoff Task – Cable Tray.
This sets the appropriate specification and Takeoff Pad. Change the Specification as needed.
2. On the Takeoff Pad, click the ladder icon.
3. In the assembly menu, enter:
Cable Tray Depth - 4"
Cable Tray Width - 12”
Cable Tray Type - Aluminum
Cable Tray Cover Type - None
Tray Divider(s)? - No
Provided by? - EC
Quantity - 20
7. Click “OK”.
8. The added items will be displayed in this window and an icon will be depict that there are added items to this takeoff.
9. Select “OK”.
10. Click the “+” to view the results of the takeoff.