This example covers Fire Alarm Systems.
1. In Breakdowns, change the Bid Item, Drawing, Area, and Phase as needed. Select Systems – 200 Fire Alarm Conduit. Select the Takeoff Task – Fire Alarm.
2. Ensure the correct Attributes are selected. All Attributes can be checked for systems.
3. On the Takeoff Pad, click the pull station icon
4. In the assembly menu, populate the ICT Box Type, Stub Size, Stub Length, Plenum Rating, Shield Type, and Count = 1.
5. Hit [Enter] on your keyboard or select “OK”.
6. Click the “+” to view the results of the takeoff.