1. In Breakdowns, change the Bid Item, Drawing, Area, and Phase as needed. Select Systems -070-Power Devices-Connections and Wiring. Select the Excellerate Wiring Devices Takeoff Task.
This sets the appropriate specification and Takeoff Pad.
2. Ensure the correct Attributes are selected.
3. On the Takeoff Pad, under Toggle Switch(es)(Up to 6 Devices), click the 3W Switch
4. In the assembly menu, select:
3/4 Inch Minimum? - [No]
Device Box Type - Stamped Steel
Mud Ring Depth? - 3/4"
Wire Size - #12
Quantity - 1
5. Hit [Enter] on your keyboard or select “OK”.
6. Click the “+” to view the results of the takeoff.