Your group is designing a bridge to span 42-in., which is 3.5X the length of the longest component in your inventory (12-in. paint stirrers).
Each group will start with an inventory consisting of:
Your bridge should support the passage of a remote-controlled RC-Bridge across the bridge and over a barricade in less than 5 seconds (non-destructive test).
You will then place hex nuts on the bridge while the other groups count how many hex nuts your bridge can support without failing.
Scoring Guide (30 points; 45 points possible!)
Web Post - Document Your Building Experience - web post should include
Document four (4) of the eight Innovation Rubric behaviors; (for each instance, include at least two drawings, storyboards, and/or before/after pictures as supporting evidence of your Innovation Behavior and three supporting evidence bullets describing how you measured up to the Proficient description of the Innovative Behavior.