Nov. 28, 2022 : We're rebuilding BuildingSHSU. Some pages and links may not appear or be active. Bear (kat) with us.
Parkhill and the three surrounding houses were scheduled for demolition during the fall 2014 semester [2].
The house was last used as a residence during the 2015-16 school year with an occupancy of x mixed-gender students. The Department of Residence Life announced the building would be unavailable the next school year as it was slated for demolition [3].
The four houses were demolished in July 2016 to make way for the Biology Laboratory Building.