Overview: Concrete Luten arch bridge over Necanicum River on W. Broadway in Seaside
Location: Seaside, Clatsop County, Oregon
Status: Open to traffic
History: Built 1924
Builder: Daniel B. Luten (Patent Design Engineer)
Design: Closed spandrel Luten arch
Length of largest span: 43.0 ft.
Total length: 152.0 ft.
Deck width: 30.0 ft.
6,622
ORNBI 07C11 000 00000 (Oregon bridge number on the National Bridge Inventory)
BH 29904 (Bridgehunter.com ID)
Good/Fair/Poor Condition: Poor
Status: Open, no restriction [A]
Average daily traffic: 6,622 [as of 2010]
Truck traffic: 10% of total traffic
Deck condition: Fair [5 out of 9]
Superstructure condition: Satisfactory [6 out of 9]
Substructure condition: Poor [4 out of 9]
Structural appraisal: Basically intolerable requiring high priority of replacement [2]
Deck geometry appraisal: Basically intolerable requiring high priority of corrective action [3]
Water adequacy appraisal: Better than present minimum criteria [7]
Roadway alignment appraisal: Equal to present desirable criteria [8]
Channel protection: Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition: Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Sufficiency rating: 37.6
Recommended work: Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work: $857,000
BridgeReports.com: W BROADWAY over NECANICUM RV