Completed bent caps on I-35 near Stassney Lane in Sept. 2024The project includes adding elevated managed lanes between SH 71/Ben While Boulevard and Slaughter Lane and constructing a southbound I-35 bypass lane that will allow traffic to bypass Stassney Lane and William Cannon Drive.
The project will add two high-occupancy-vehicle (HOV) managed lanes in each direction along I-35 between SH 71/Ben White Boulevard and SH 45 Southeast. In addition, the project will reconstruct bridges, relocate and reconstruct entrance and exit ramps, add pedestrian and bicycle paths and make additional safety and mobility improvements within the project limits.
Construction cost: $548 million funded by CAMPO and TxDOT
Construction start: November 2022
Anticipated construction completion: Late 2028, weather permitting
Fluor Corporation
Construct elevated lanes from SH 71/Ben White Boulevard to Slaughter Lane
Construct at-grade managed lanes from Boggy Creek Drive to SH 45 Southeast
Reconstruct I-35 bridge over South Boggy Creek
Reconstruct I-35 bridge over Onion Creek
Widen the I-35 bridge over Slaughter Creek
Reconstruct I-35 entrance and exit ramps
Construct shared-use paths along frontage roads
Perform final paving and striping to finalize project