The Great Wall Project was the first large-scale project to start in EmoKingdom03_.
The Great Wall was built by H.M. King S. Cubby, and designed by H.R.H. Lt. King M. Scott.
The Great Wall is made entirely of Stone Bricks, in block, stair, and slab forms.
The Wall is designed to protect and mark the border of the EmoKingdom03_ Mainland.
Head of the Great Wall Project
(September 23 2024 - October 3 2024)
The original stage of building saw multiple designs floated. Finally, a design was chosen for a one block wide wall with ornamentation on the top.
This project was of great cost to the early empire, with stone mostly coming from mines to be smelted on Cherry Mountain manually.
This project also saw the introduction of the first automated smelting system in the EmoKingdom03_ Empire, being built on Sept. 25th, 2024.
To fuel the smelting of cobblestone, coal and wood were originally used. Once the project began requiring more production, two charcoal farms were used.
The first of the charcoal farms was constructed by H.M. Queen EmoGirl03_ on Sept. 29th, 2024 on Cherry Mountain.
The second charcoal farm was constructed by H.M. King S. Cub & Governor Allen of Gyattland on Oct. 3rd, 2024, in the Sheep Territory.
(October 3 2024 - October 18 2024)
With the wall's construction well underway, more advancements were being made and production of stone in the kingdom skyrocketed.
By Sept.25th, the majority of the wall's basic structure had been completed.
However, minor alterations and a major effort to finish the wall would still need to take place.
On October 6th, 2024, the first super smelter in EmoKingdom03_ was constructed, which greatly increased the output of stone.
The super smelter featured eight coal-powered furnaces, which would later be upgraded to use lava as a more renewable source of fuel.
Though even with these major production boosts, most stone was still going to the production of EmoKingdom Castle and other structures in the empire.
(October 18 2024 - Present)
On October 18th, 2024, a second eight furnace super smelter would be built on Cherry Island.
The next day, an industrial kelp farm would also be built in hopes of satisfying the fuel requirements for the super smelters.
The kelp farm never produced enough fuel, leading to an increase in lava fuel use.
Construction began on the wall's top ornaments & walk way on October 18th, 2024.
By October 20th, stone was becoming even more valuable, as it could be traded for emeralds.
There was not enough stone to fuel both the Kingdom Wall and Emerald production, so a new fifty furnace super smelter was created.
The new fifty-furnace smelter was too fast for hand-mining stone, so on Nov. 19th, 2024, an industrial stone farm was built in Stoneshire Territory.
Since then, the production of stone has been EmoKingdom03_'s largest export.
The Kingdom wall has been far easier to produce since these farms and smelters were built.
In early December of 2024, an agreement was created between Dumbgamers22 and EmoKingdom to contract the construction of the latter potions of
the Kingdom wall to Dumbgamers22, though this contract has yet to be signed by the EmoKingdom03_.
As of January, 2025, the wall still remains incomplete.
The head of the Great Wall Project has been directly quoted in saying "I WILL FINISH THE WALL, 2025, THE YEAR OF THE WALL".
The projected competition date of the Great Wall is 2025.