ePlan: 2007-2008

EAST CENTRAL ISD Technology Plan for E-Rate Year 10

2007 - 2008

GARY PATTERSON

SUPERINTENDENT

DISTRICT PROFILE

ESC Region: 20

City, State Zip: SAN ANTONIO, TX 782639701

Phone: (210) 648-7861

Fax: (210) 648-0931

Number of Campuses: 13

Total Student Enrollment: 8483

District Size: 5,000 - 9,999

Percent Econ. Disadvantaged: 57.21%

Technology Expenditures: $1,094,970.00

- Teaching and Learning Budget: $339,265.00

- Educator Preparation and Development Budget: $103,680.00

- Leadership, Administration and Support Budget: $160,640.00

- Infrastructure for Technology Budget: $491,385.00

Technology Expenditure Per Pupil: $129.08

Number of Campuses with Direct Connection to Internet: 13

Percentage of Campuses with Direct Connection to Internet: 100.00%

Number of Classrooms with Direct Connection to Internet: 614

Percentage of Classrooms with Direct Connection to Internet: 100.00%

Computer/Student Ratio: 3 student(s) for every computer

Computer/Teacher Ratio: 1 teacher(s) for every computer

Number of campuses that need to complete the Texas Campus STaR Chart: 13

Percentage of campuses that have completed the Texas Campus STaR Chart: 100.00 %

PLAN INTRODUCTION

Plan Last Edited: 02/21/2007

Technology Planning Committee:

Stacia FitzSimon

Jim Selby

Patti Birney

Wes Stevens

Wayne Milner

Judy Burns

Wayne Milner

Tom Grove

Aric Jimenez

Kourtney Wallace

Cheri Kosub

Mary Recker

Kathy Petrequin

Nancy Gonzales

Connie Guerra

Susie Havard

Marguerite Lowak

Natalie Ouellette

Janice Shanklin

Liz Wilson

Nancy Janysek

EXECUTIVE SUMMARY

The Technology Planning Committee determined that a one-year plan was most appropriate for East Central. Therefore, the plan addresses a limited scope of objectives for the 2007-2008 school year.

The plan strives to identify ways in which technology can be used to support district goals and objectives for improvement.

The plan addresses infrastructure needs, focusing on strategies for increasing the efficiency of district networks and increasing bandwidth for Internet use.

The plan addresses staff development, which was identified as the primary need. Objectives and strategies have been developed that include increased use of online resources to supplement current face to face training sessions.

The plan addresses student achievement through the district's on-going efforts to engage students in multimedia learning projects. We will also focus on student technology competencies at the elementary level.

Finally, the plan addresses administrative effectiveness and efficiency through support of many current practices and by continuing to explore ways to move to a "paperless" working environment.

NEEDS ASSESSMENT

Assessment Process: Each campus completed the Texas STaR assessment.

Each campus technology coordinator submitted a description of current status and anticipated hardware and software needs based on individual campus improvement plans.

Campus principals were interviewed to determine the extent to which technology was facilitating the overall operation of their schools.

District staff reviewed the ECISD WAN to determine immediate needs for upgrades, increased bandwidth, and disaster recovery.

Individual campus site-based decision-making committees were asked to review local improvement plans and make suggestions regarding how technology can be used to help meet the goals and objectives contained in the plans.

Existing Conditions:

All district classrooms have Internet access. Approximately 85% of the classrooms have switched 100Base-T connection speeds. All district workstations use a 3MB connection to the Internet; each campus connects to the District MDF through point-to-point T1 lines. The district's external internet connection currently consists of two 3MB lines. Two locations, East Central High School and Legancy Middle School, are running GigaMan services. All classrooms have at least one workstation that is less than 3 years old and at least one additional workstation. There is an average of 3 workstations in each classroom.

Each elementary campus has a 30-station computer lab. Several have additional mobile mini-labs. Multiple computers in each library access the Alexandria library automation system.

Each intermediate school has a computer lab in addition to multiple classroom workstations.

Each middle school has one computer applications classrooms with 30 computers and a multimedia classroom with 30 computers. The library has 25 workstations for student use. There are two mobile computer labs with 16 laptops on each cart that are available for check out at Heritage Middle School. Each classroom has at least one workstation that is less than 3 years old and at least three additional computers.

The high school has numerous computer-based classrooms as well as teacher and student workstations in each classrooms and a centrally located distance learning lab. There are 25 Internet-connected computers in the library and an additional 25 computers in a lab that can be scheduled for general use. The high school's Early College High School has two wireless carts with twenty-six laptops each. The Digital Campus has three hundred students involved in the district's 1:1 laptop initiative.

Each teacher and administrative workstation has a standard set of software, including Microsoft Office. All intermediate and secondary teachers use GradeSpeed for online grading and attendance. All staff have an email account on the East Central First Class email system. There are several special programs with student email accounts, including the Learning Academy, Digital Campus, and Early College High School at the high school.

Seventy percent of the campuses have a closed-circuit TV network that is used for daily announcements.

Technology Needs:

There is a continuing need to upgrade computers and related equipment. At a minimum, all teachers and administrators need a computer that is less than 4 years old to be able to perform all computer-related tasks.

There is a significant need for staff development, as determined by the STaR assessments. There is a critical issue of time: other district initiatives driven by state-mandated testing programs have tended to use up what limited time is available for staff development.

Staff development needs include basic computer skills as well as more complex technology integration capacities.

There is a need to upgrade existing infrastructure. Current point-to-point T1 lines are generally adequate. GIgaman services have been established at East Central High School and are pending at Legacy Middle School which will come online in mid-May 2006. There is a general need, in the long run, to increase bandwidth on all other WAN connections.

GOALS, OBJECTIVES, AND STRATEGIES

Goal 1: Increase student achievement by integrating technology into teaching and learning in all areas.

Objective 1.1: Monitor levels of technology integration in teaching and learning at all grade levels.

Budget for this objective: $11,453.50

LRPT Category: Educator Preparation and Development

E-Rate Correlates: ER01 ER02

NCLB Correlates: 01 02 03 04a 04b 07 11

Strategy 1.1.1: Refine Web-based technology integration survey.

State: Original

Status: In Progress

Timeline: July - August, 2007

Person(s) Responsible: District Network Manager, District Database Manager, Instructional Technology Specialist

Evidence: Survey online and ready to use.

Comments:

LRPT Correlates: EP01, EP08, TL04, TL06

Strategy 1.1.2: Survey teachers to identify current uses of technology

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - May, 2008. At least two surveys will be conducted during the 2007-2008 school year.

Person(s) Responsible: District Database Manager, Instructional Technology Specialist, Campus Technology Coordinators

Evidence: Survey results on file with lists of instructional activities that use technology.

Comments:

LRPT Correlates: EP04, EP05

Objective 1.2: Identify additional areas where technology can be integrated into the curriculum

Budget for this objective: $15,000.00

LRPT Category: Educator Preparation and Development

E-Rate Correlates: ER01 ER02

NCLB Correlates: 01 02 03 04a 04b 07 08

Strategy 1.2.1: Implement web-based Accelerated Math and/or Accelerated Reading at selected campuses enabling student access from local or remote locations.

State: Original

Status: In Progress

Timeline: Ongoing: August, 2007 - May, 2008

Person(s) Responsible: No Child Left Behind Facilitator, Technology Operations Manager, Network Engineer

Evidence: Weekly and quarterly reports, increased student progress, teacher observation.

Comments:

LRPT Correlates: TL04, TL07, TL09, TL15

Strategy 1.2.2: Post technology-rich lesson plans on District Web pages.

State: Original

Status: In Progress

Timeline: On-going: August 2007 - June 2008.

Person(s) Responsible: Instructional Technology Specialist, Campus Technology Coordinators, Teachers

Evidence: Projects posted on the ECISD website. Appendix C is a link to one such project.

Comments: This is an on-going effort; we currently have over 100 projects available to district teachers.

LRPT Correlates: TL01, TL05, TL06, TL08, TL12, TL13, TL14

Strategy 1.2.3: Research the World Wide Web for technology-based instructional modules.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - May, 2008

Person(s) Responsible: Instructional Technology Specialist, Campus Technology Coordinators, Teachers

Evidence: Lessons posted on District web pages with WWW links included. Updated links on District Curriculum Assessment and Alignment Project web pages (CAAP Intranet).

Comments:

LRPT Correlates: I09, LAS01, TL01, TL02, TL05, TL06, TL08, TL09, TL10, TL11, TL12, TL13, TL14, TL15

Strategy 1.2.4: Develop and maintain local web sites to share resources.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: District Technology Specialist, Campus Web Masters, classroom teachers.

Evidence: "Last Updated" dates for posting campus/classroom web pages.

Comments:

LRPT Correlates: TL12, TL13, TL14, TL15, TL16

Objective 1.3: Implement strategies that use technology to improve teaching and learning

Budget for this objective: $25,000.00

LRPT Category: Teaching and Learning

E-Rate Correlates: ER01 ER02

NCLB Correlates: 01 02 03 04a 04b 07

Strategy 1.3.1: Conduct training to demonstrate how to integrate technology into the teaching and learning process.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Instructional Technology Specialist, Campus Technology Coordinators, Teachers

Evidence: Classroom observation records, interviews with teachers, student performance data, teacher surveys, sign-in sheets

Comments:

LRPT Correlates: EP01, EP02, EP03, EP04, EP05, EP07, EP09

Strategy 1.3.2: Provide incentives and support to teachers who develop model practices using technology.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - May, 2008

Person(s) Responsible: Instructional Technology Specialist, Campus Technology Coordinators

Evidence: Records of resources provided to individual teachers, copies of training certificates awarded.

Comments: This is part of an on-going incentive plan for providing specialized equipment and/or software to teachers who are early adopters and recognize the importance of implementing technology rich instructional in all curriculum areas.

LRPT Correlates: EP01, EP02, EP04, EP05, EP06, EP07, LAS03, TL01, TL02, TL06, TL08

Objective 1.4: Implement a 1:1 Digital Campus for four hundred 9-12th grade students.

Budget for this objective: $246,113.00

LRPT Category: Teaching and Learning

E-Rate Correlates: ER01 ER02

NCLB Correlates: 01 02 03 04a 04b 05 07 09 11 12

Strategy 1.4.1: Identify participating students for inclusion in the Digital Campus@East Central High School, our 1:1 laptop initiative.

State: Original

Status: In Progress

Timeline: May, 2007

Person(s) Responsible: Instructional Technology Specialist, Middle School Principals, Middle School Academic Deans, Digital Campus Principal, High School Principal

Evidence: List of students.

Comments:

LRPT Correlates: EP03, I04, TL01, TL07, TL08, TL09

Strategy 1.4.2: Provide staff development for participating teachers.

State: Original

Status: In Progress

Timeline: Summer, 2007 for initial teacher training. Weekly meetings throughout the 2007-08 school year. Ongoing one-to-one, "just in time" training in participating teachers' classrooms.

Person(s) Responsible: Instructional Technology Specialist, Digital Campus Principal

Evidence: Curriculum units and technology-rich lesson plans completed by participants. Records of meetings. Observation notes. Teacher skill surveys.

Comments:

LRPT Correlates: EP01, EP02, EP03, EP04, EP05, EP06, EP07, EP08, EP09

Strategy 1.4.3: Provide staff development for Digital Campus students and/or parents.

State: Original

Status: In Progress

Timeline: Summer, 2007, periodically throughout the school year as needed

Person(s) Responsible: Instructional Technology Specialist, Digital Campus Principal

Evidence: Student evaluations, sign-in sheets

Comments: These voluntary evening workshops are vehicles to assist students and their parents become familiar with the laptop, the operating system, and the software prior to the beginning of the school year.

LRPT Correlates: TL01, TL05, TL06, TL08, TL09, TL12, TL13, TL14, TL15

Strategy 1.4.4: Provide on-going support to participating teachers.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Instructional Technology Specialist, High School Principal, Digital Campus Principal, Campus Academic Dean

Evidence: Calendar entries of classroom visits, teacher surveys

Comments:

LRPT Correlates: EP01, EP03, EP04, EP05, EP06, EP08, EP09, I02, LAS03, LAS05, LAS06, LAS10, TL01, TL03, TL05, TL06, TL07, TL08, TL12, TL13, TL14, TL15, TL16

Strategy 1.4.5: Evaluate impact on student achievement and attitudes through online surveys.

State: Original

Status: In Progress

Timeline: April - May, 2008

Person(s) Responsible: Instructional Technology Specialist, Digital Campus Principal, Campus Academic Dean

Evidence: Copies of student and parent survey results, Benchmark assessment reports, TAKS results

Comments:

LRPT Correlates: LAS01, LAS02, TL15, TL16

Goal 2: Develop strategies to help students meet the technology TEKS.

Objective 2.1: Enable administrators, teachers, parents and students (where appropriate) to summarize relevant technology TEKS requirements.

Budget for this objective: $1,500.00

LRPT Category: Teaching and Learning

E-Rate Correlates: ER01

NCLB Correlates: 01 03

Strategy 2.1.1: Make technology TEKS available to all campuses, organized by end-of-grade benchmarks.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - May, 2008

Person(s) Responsible: Instructional Technology Specialist, Campus Principals, Campus Technology Coordinators.

Evidence: Written/oral summarization and knowledge of the TEKS, based on informal surveys and observations.

Comments:

LRPT Correlates: EP01, TL01, TL02

Objective 2.2: Develop and implement instructional activities that involve technology TEKS performance descriptors.

Budget for this objective: $10,000.00

LRPT Category: Teaching and Learning

E-Rate Correlates: ER01

NCLB Correlates: 01 02 04a 04b 07 08 11

Strategy 2.2.1: Provide training for and facilitate sharing of projects developed by teachers.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Instructional Technology Specialist, Campus Technology Coordinators, Campus Principals

Evidence: Projects posted on district and/or campus web sites.

Comments:

LRPT Correlates: EP01, EP03, EP04, EP05, EP07, EP08, LAS03, TL01, TL03, TL06, TL08, TL09, TL14

Strategy 2.2.2: Identify technology-rich instructional activities for inclusion in daily lessons.

State: Original

Status: In Progress

Timeline: July, 2006 - June, 2007

Person(s) Responsible: Technology Director, District Technology Specialist, Teachers, Campus Technology Coordinators, Campus Administrators

Evidence: Review of lesson plans, classroom observation reports.

Comments:

LRPT Correlates:

Objective 2.3: Implement technology TEKS instruction in all elementary school computer labs.

Budget for this objective: $11,652.00

LRPT Category: Teaching and Learning

E-Rate Correlates: ER01 ER02

NCLB Correlates: 01 03 04a 04b 07

Strategy 2.3.1: Refine existing elementary technology TEKS curricular materials.

State: Original

Status: In Progress

Timeline: By October 1, 2007

Person(s) Responsible: Instructional Technology Specialist, Campus Technology Coordinators, Computer Lab Teaching Assistants

Evidence: Published curriculum guides/frameworks on district intranet and available to all schools.

Comments: The district has adopted SRA's TechKnowledge as the adopted curriculum for grades K-4.

LRPT Correlates: TL01, TL03

Strategy 2.3.2: Train computer lab teaching assistants in use of elementary technology TEKS curriculum materials.

State: Original

Status: Planned

Timeline: August - November, 2007

Person(s) Responsible: Instructional Technology Specialist, Campus Technology Coordinators

Evidence: Copies of training materials, agendas, evaluations, and sign-in sheets.

Comments:

LRPT Correlates: TL01, TL03

Strategy 2.3.3: Implement and evaluate elementary technology TEKS instruction.

State: Original

Status: Planned

Timeline: November, 2007 - May, 2008

Person(s) Responsible: Elementary Computer Lab Teaching Assistants, Campus Technology Coordinators, Campus Principals, Instructional Technology Specialist.

Evidence: Copies of lab lesson plans, student-created products, results of end-of-year student skill surveys.

Comments:

LRPT Correlates: TL01, TL03

Goal 3: Increase educators' effectiveness in using technology.

Objective 3.1: Monitor proficiency levels of teachers, support staff, and administrators at all levels.

Budget for this objective: $7,000.00

LRPT Category: Educator Preparation and Development

E-Rate Correlates: ER01 ER02

NCLB Correlates: 04b 11 12

Strategy 3.1.1: Periodically survey all staff using local web-based technology skills survey.

State: Original

Status: Planned

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Instructional Technology Specialist, District Database Manager, Campus Principals, Campus Technology Coordinators

Evidence: Completed surveys

Comments:

LRPT Correlates: EP04, EP05, LAS03

Strategy 3.1.2: Analyze survey results to determine priorities for training.

State: Original

Status: Planned

Timeline: On-going: at least 2 times during the 2007-2008 school year.

Person(s) Responsible: Instructional Technology Specialist, Campus Technology Coordinators, Campus Principals

Evidence: Summaries of survey results.

Comments:

LRPT Correlates: EP01, EP02, EP04, EP05, I01, LAS01, LAS03, TL05, TL14

Objective 3.2: Develop training modules to address identified needs.

Budget for this objective: $35,000.00

LRPT Category: Educator Preparation and Development

E-Rate Correlates: ER01 ER02

NCLB Correlates: 01 03 04b 07 12

Strategy 3.2.1: Develop printed and electronic training materials.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Instructional Technology Specialist

Evidence: File copies of training guides; training materials published on local district web pages.

Comments: Training materials will be offered in multiple formats including handouts, streaming video, and podcasts.

LRPT Correlates: EP01, EP02, EP04, EP05, EP08, I01, TL14

Strategy 3.2.2: Purchase and/or develop software for training, including subscriptions to online training programs.

State: Original

Status: In Progress

Timeline: By September 30, 2007.

Person(s) Responsible: Instructional Technology Specialist

Evidence: Software available to teachers, staff, and students; online training access logs

Comments:

LRPT Correlates: EP01, EP03, EP04, EP05, EP08, EP09, I01, LAS01, TL14

Objective 3.3: Implement training to meet identified needs and assess the effectiveness of programs designed to increase technology proficiencies.

Budget for this objective: $30,226.50

LRPT Category: Educator Preparation and Development

E-Rate Correlates: ER01 ER02

NCLB Correlates: 01 03 04a 04b 11

Strategy 3.3.1: Schedule training for teacher during workdays, after school hours, weekends, and summer months.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Instructional Technology Specialist, Campus Webmasters, Campus Technology Coordinators, District Curriculum Staff

Evidence: List of sessions scheduled, sign-in sheets, session evaluations

Comments:

LRPT Correlates: EP01, EP02, EP03, EP04, EP05, EP07, EP08, LAS08, TL14

Strategy 3.3.2: Follow training with surveys, walk-through observations, informal interviews, and peer coaching to ensure staff development implementation.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - May, 2008

Person(s) Responsible: Instructional Technology Specialist, Campus Administration

Evidence: Surveys, observation summaries, interview records on file.

Comments:

LRPT Correlates: EP01, EP02, EP03, EP04, EP05, EP08, EP09, I01, I03, LAS01, LAS02, LAS03, LAS06, TL01, TL02, TL05, TL06, TL08, TL14

Objective 3.4: Monitor mastery of SBEC Technology Applications Educator Standards as part of the yearly teacher appraisal system.

Budget for this objective: $25,000.00

LRPT Category: Leadership, Administration and Support

E-Rate Correlates: ER01 ER02

NCLB Correlates: 01 02 04a 04b 07 08 09 11 12

Strategy 3.4.1: Review SBEC Technology Applications Educator Standards with campus administrators.

State: Original

Status: Planned

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Instructional Technology Specialist, Campus Principals, Superintendent

Evidence: Sign-in sheets, agendas, copy of handouts

Comments:

LRPT Correlates: EP01, EP02, EP03, EP04, EP05, LAS01, LAS02, LAS03, LAS05, LAS12, TL01, TL02, TL03

Strategy 3.4.2: Follow training with informal walk-through observations and formal PDAS observations.

State: Original

Status: Planned

Timeline: On-going: August, 2007 - May, 2008

Person(s) Responsible: Instructional Technology Specialist, Campus Administrators, Superintendent

Evidence: PDAS documentation

Comments:

LRPT Correlates: EP01, EP02, EP05, LAS12

Objective 3.5: Implement distance learning opportunities.

Budget for this objective: $5,000.00

LRPT Category: Educator Preparation and Development

E-Rate Correlates: ER01 ER02

NCLB Correlates: 01 02 06 08 09

Strategy 3.5.1: Collaborate with Military Child Education Coalition to include distance counseling at the middle school and high school levels.

State: Revised

Status: In Progress

Timeline: On-going: August, 2007 - May, 2008

Person(s) Responsible: Instructional Technology Specialist, Network Engineer, High School Counselors, Middle School Counselors

Evidence: Phone logs, site visits to other distance counseling locations

Comments:

LRPT Correlates: I01, I05, I06, LAS05, LAS07, LAS09, LAS13, LAS15, TL08, TL14

Strategy 3.5.2: Implement distance learning opportunities at the secondary level.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Instructional Technology Specialist, Secondary Curriculum Director, Network Engineer, High School Administration, High School Teachers

Evidence: Student participation, videoconferencing schedules with other distance learning sites

Comments:

LRPT Correlates: EP01, EP04, EP05, EP08, EP09, I01, I03, I09, LAS13, LAS15, TL01, TL02, TL08, TL09, TL12, TL13, TL14, TL15

Goal 4: Integrate technology into instructional management and administration.

Objective 4.1: Develop and support a viable, comprehensive district technology plan.

Budget for this objective: $22,000.00

LRPT Category: Leadership, Administration and Support

E-Rate Correlates: ER01 ER02

NCLB Correlates: 01 02 03 04a 04b 05 06 07 08 09 10 11 12

Strategy 4.1.1: Conduct monthly meetings to assess campus and district technology needs.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - May, 2008

Person(s) Responsible: Superintendent, Campus Administrators, Campus Technology Coordinators, Instructional Technology Specialist, Technology Operations Manager, Network Engineer

Evidence: Agendas, sign-in documentation, minutes of meetings.

Comments:

LRPT Correlates: LAS02, LAS04

Strategy 4.1.2: Complete teacher and campus STaR charts.

State: Original

Status: Planned

Timeline: By December, 2007

Person(s) Responsible: Campus Administrators, Campus Technology Coordinators, Instructional Technology Specialist

Evidence: All teacher and campus STaR charts have been electronically submitted.

Comments:

LRPT Correlates: LAS04

Strategy 4.1.3: Meet with individual campuses to determine current and future needs.

State: Original

Status: Planned

Timeline: By December, 2008.

Person(s) Responsible: Campus Administrator, Campus Technology Coordinator, Technology Operations Manager, Instructional Technology Specialist

Evidence: Minutes of meetings

Comments: Discussions will center on the topics of hardware, software, and staff development needs.

LRPT Correlates: I01, I04, I07, LAS04

Strategy 4.1.4: Revise district technology ePlan to include current and future technology efforts.

State: Original

Status: Planned

Timeline: January, 2008

Person(s) Responsible: Instructional Technology Specialist, Technology Operations Manager, Network Engineer

Evidence: Completed district technology plan.

Comments:

LRPT Correlates: LAS02, LAS04

Objective 4.2: Implement a system for web-based submission and review of grades, attendance data, student progress reports, and other instructional management tasks.

Budget for this objective: $45,000.00

LRPT Category: Leadership, Administration and Support

E-Rate Correlates: ER01 ER02

NCLB Correlates: 05 09 12

Strategy 4.2.1: Support implementation of the GradeSpeed web-based grading and attendance reporting system.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - May, 2008

Person(s) Responsible: Instructional Technology Specialist, Technology Operations Manager, Network Engineer, Database Manager, Campus No Child Left Behind Facilitators, Campus Technology Coordinators, Campus Administrators

Evidence: Records of use of GradeSpeed system on file.

Comments:

LRPT Correlates: LAS05, LAS06, LAS09, LAS11, LAS13

Strategy 4.2.2: Provide staff development and training in the use of the GradeSpeed grade and attendance reporting system.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Instructional Technology Specialist, Technology Operations Manager, Network Engineer, Database Manager, Campus No Child Left Behind Facilitators, Campus Technology Coordinators, Campus Administrators

Evidence: Files containing training schedules, agendas, sign-in sheets.

Comments:

LRPT Correlates: EP02, EP03, EP04, EP05, LAS05, LAS06, LAS08, LAS09, LAS10, LAS11, TL07, TL15, TL16

Strategy 4.2.3: Provide staff development and training in the use of the GradeSpeed Lesson Plan Module.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Instructional Technology Specialist, No Child Left Behind Facilitator, Campus Technology Coordinators, Campus Administrators

Evidence: Completed lesson plans stored on the GradeSpeed server.

Comments:

LRPT Correlates: EP02, EP03, EP04, EP05, EP09, LAS01, LAS05, LAS06, LAS08, TL05, TL07, TL08, TL16

Strategy 4.2.4: Make parent access accounts available and provide training for parental use of the GradeSpeed online grading and attendance reporting system.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Instructional Technology Specialist, Campus Attendance Clerks

Evidence: File copies of training schedules and dates, agendas, sign-in sheets.

Comments:

LRPT Correlates: LAS11, TL15

Objective 4.3: Continue to support the PDA-based assessment and management of the Texas Primary Reading Inventory.

Budget for this objective: $19,000.00

LRPT Category: Leadership, Administration and Support

E-Rate Correlates: ER01 ER02

NCLB Correlates: 01 02 05 06 07

Strategy 4.3.1: Collect, recharge, and reload TPRI software in handheld devices.

State: Original

Status: In Progress

Timeline: By August 31, 2007.

Person(s) Responsible: Elementary Curriculum Director, Campus No Child Left Behind Facilitators, Campus Technology Coordinators, Campus Teachers

Evidence: All handheld devices are ready to use.

Comments:

LRPT Correlates: I09, LAS01, LAS03, LAS05, LAS08, TL04, TL05, TL07

Strategy 4.3.2: Provide on-going technical support for teachers using the handheld TPRI assessment.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - May, 2008

Person(s) Responsible: Elementary Campus Technology Coordinators, Elementary No Child Left Behind Facilitators, Region XX Support Staff

Evidence: Technology service database records

Comments:

LRPT Correlates: I01, I09, LAS01, LAS02, LAS10, TL04

Objective 4.4: Continue to support use of electronic lesson planning forms, PDAS, TSR, AEIS-IT, ITCCS, and locally-developed records-management databases.

Budget for this objective: $9,782.00

LRPT Category: Leadership, Administration and Support

E-Rate Correlates: ER01 ER02

NCLB Correlates: 04b 06 07 12

Strategy 4.4.1: Review/revise existing locally-developed gradebook programs, lesson plan forms, campus improvement planning forms, health databases, discipline management databases, mileage databases, and inventory databases.

State: Original

Status: In Progress

Timeline: By August 15, 2007

Person(s) Responsible: District Database Manager

Evidence: Gradebooks, planning forms, and databases installed and in use.

Comments:

LRPT Correlates: EP08, LAS01, LAS05, LAS08, TL14

Strategy 4.4.2: Assist campus data clerks with the use of web-based student information management (ITCCS).

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Database Manager

Evidence: Technology service database records.

Comments:

LRPT Correlates: LAS01, LAS08

Strategy 4.4.3: Revise and update Curriculum Alignment and Assessment Project databases for use in ECISD benchmark testing program.

State: Original

Status: In Progress

Timeline: By August 15, 2007.

Person(s) Responsible: District Database Manager

Evidence: Revised CAAP databases ready for data entry.

Comments:

LRPT Correlates: LAS01, LAS05, LAS08

Objective 4.5: Support the district's use of the Region XX online requisition system.

Budget for this objective: $5,000.00

LRPT Category: Leadership, Administration and Support

E-Rate Correlates: ER01 ER02

NCLB Correlates: 06 12

Strategy 4.5.1: Assist campus budget stewards with the implementation and use of the web-based finance system.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Assistant Superintendent for Business and Finance, Finance Director, Technology Operations Manager, Network Engineer

Evidence: Staff development sign-in sheets, campus visits

Comments:

LRPT Correlates: LAS08

Strategy 4.5.2: Provide on-going technical support for budget stewards using the web-based finance system.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Network Manager, Technology Operations Manager, Finance Director

Evidence: Phone and travel logs, technical support request work orders

Comments:

LRPT Correlates: LAS08

Objective 4.6: Implement a system for web-based submission and storage of special education data.

Budget for this objective: $17,358.00

LRPT Category: Leadership, Administration and Support

E-Rate Correlates: ER01 ER02

NCLB Correlates: 02 05 06 11

Strategy 4.6.1: Support the implementation of J7 special education student management system.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Special Education Director, Special Education Facilitators, Instructional Technology Specialist, Campus Technology Coordinators

Evidence: Records of use of J7 on file.

Comments:

LRPT Correlates: LAS05, LAS08, LAS10

Strategy 4.6.2: Provide staff development and training in the use of J7.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Special Education Director, Special Education Facilitators, Instructional Technology Specialist

Evidence: Files containing training schedules, agendas, and sign -in sheets.

Comments:

LRPT Correlates: LAS06, LAS08, LAS10

Objective 4.7: Implement a system for web-based submission and review of school board agendas items.

Budget for this objective: $7,500.00

LRPT Category: Leadership, Administration and Support

E-Rate Correlates: ER01 ER02

NCLB Correlates: 05 06 09 12

Strategy 4.7.1: Support the implementation of BoardBook web-based documentation system.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Superintendent, Coordinator of Executive Services, Superintendent's Secretary, Curriculum Secretarial Staff, Finance Secretarial Staff, Technology Operations Manager, Technicians, Network Engineer.

Evidence: Records of use of BoardBook on file.

Comments:

LRPT Correlates: LAS08, LAS09, LAS13

Strategy 4.7.2: Provide staff development and training in the use of BoardBook.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Technology Operations Manager

Evidence: File copies of training schedules and dates, agendas, sign-in sheets.

Comments:

LRPT Correlates: LAS08

Goal 5: Expand community access to school information through technology.

Objective 5.1: Continue to provide campus-based web pages.

Budget for this objective: $20,000.00

LRPT Category: Teaching and Learning

E-Rate Correlates: ER01 ER02

NCLB Correlates: 03 08 09 12

Strategy 5.1.1: Provide ongoing training in web page construction to campus webmasters.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: District Technology Specialist

Evidence: Web pages online.

Comments: The District Technology Specialist serves as District Web Master.

LRPT Correlates: EP01, EP02, EP04, EP09, I01, I02, I03, I05, I08, I09, LAS05, LAS06, LAS07, LAS08, LAS09, LAS10, TL10, TL12, TL14, TL15, TL16

Strategy 5.1.2: Provide training to classroom teachers for development of classroom-based web pages.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Instructional Technology Specialist, Campus Webmasters

Evidence: Classroom web pages on line

Comments: See sample, Appendix B.

LRPT Correlates: EP01, EP02, EP04, EP05, EP08, EP09, I01, I08, TL08, TL14, TL15, TL16

Objective 5.2: Provide access to continuing education resources on district web site.

Budget for this objective: $5,000.00

LRPT Category: Teaching and Learning

E-Rate Correlates: ER01

NCLB Correlates: 09 10 12

Strategy 5.2.1: Provide current schedules and class information on Continuing Education web site.

State: Revised

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: District Technology Specialist

Evidence: Web pages published online.

Comments:

LRPT Correlates: TL14, TL15

Strategy 5.2.2: Provide training to parents and community members on resources and services available in the community.

State: Revised

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Community Education Staff

Evidence: Class rosters, sign in sheets on record

Comments:

LRPT Correlates: TL14, TL15

Objective 5.3: Provide community access to district resources for Internet access and e-mail service.

Budget for this objective: $10,000.00

LRPT Category: Teaching and Learning

E-Rate Correlates: ER01

NCLB Correlates: 09 10

Strategy 5.3.1: Develop written guidelines for public access to Internet resources in school libraries and computer labs.

State: Original

Status: In Progress

Timeline: By September 30, 2007

Person(s) Responsible: Instructional Technology Specialist, Technology Operations Manager, Network Engineer

Evidence: Copy of guideline document.

Comments: Will include instructions for patrons using district resources when facilities are open after school hours. Appendix A is a link to the ECISD Acceptable Use Policy.

LRPT Correlates: TL08, TL10, TL14, TL15

Strategy 5.3.2: Disseminate information regarding the availability of public access to the Internet within district facilities.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Instructional Technology Specialist, Public Information Officer

Evidence: Links on district web pages and articles published in district quarterly newsletter.

Comments:

LRPT Correlates: LAS09, LAS13, TL14, TL15

Objective 5.4: Add functionality to ECISD email services to include listserv access to district information.

Budget for this objective: $10,000.00

LRPT Category: Teaching and Learning

E-Rate Correlates: ER01

NCLB Correlates: 09

Strategy 5.4.1: Identify content areas for public information dissemination.

State: Original

Status: In Progress

Timeline: By September 30, 2006

Person(s) Responsible: District Public Relations Coordinator

Evidence: List of documents for public dissemination on file.

Comments:

LRPT Correlates: TL15

Strategy 5.4.2: Support and provide information for the "Key Communicators" listserv.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Public Relations Coordinator, Instructional Technology Specialist

Evidence: Electronically-generated activity logs.

Comments: Community members subscribe to the "Key Communicators" email listserv and are periodically updated on district news and events.

LRPT Correlates: TL15

Goal 6: Provide modern technology equipment to all East Central students and staff.

Objective 6.1: Purchase new technology equipment.

Budget for this objective: $181,674.54

LRPT Category: Infrastructure for Technology

E-Rate Correlates:

NCLB Correlates: 03 05

Strategy 6.1.1: Solicit orders from local campuses for new equipment, using budgets based on state technology allotment.

State: Original

Status: In Progress

Timeline: By September 30, 2007.

Person(s) Responsible: Technology Operations Manager, Campus Principals, Campus Technology Coordinators

Evidence: Orders on file.

Comments:

LRPT Correlates: I01, I03, I05, I09

Strategy 6.1.2: Complete requisitions and purchase orders for requested equipment.

State: Original

Status: In Progress

Timeline: September - October, 2007.

Person(s) Responsible: Technology Operations Manager

Evidence: Requisitions and PO's on file.

Comments:

LRPT Correlates: I01, I05, I09

Strategy 6.1.3: Install new equipment.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Technology Technicians

Evidence: Technology equipment in place.

Comments:

LRPT Correlates: I01, I05, I09

Strategy 6.1.4: Repurpose equipment replaced with new equipment.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Technology Operations Manager, Technology Technicians, Assistant Superintendet for Business and Operations

Evidence: Technician activity logs.

Comments:

LRPT Correlates: I01, I03, I07

Objective 6.2: Maintain existing equipment.

Budget for this objective: $110,739.50

LRPT Category: Infrastructure for Technology

E-Rate Correlates: ER01

NCLB Correlates: 05

Strategy 6.2.1: Maintain service ticket system for timely service and repair of technology equipment.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Technology Operations Manager, Technology Technicians

Evidence: Electronic service ticket system.

Comments:

LRPT Correlates: I01, I05, I09

Strategy 6.2.2: Implement Sophos anti-virus and spam filter.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Technology Operations Manager, Network Engineer

Evidence: Reduced spam email and viruses.

Comments: Sophos will significantly protect all district computers from spam and viruses.

LRPT Correlates: I01, I05, I09

Strategy 6.2.3: Recycle obsolete technology equipment.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Technology Operations Manager, Technology Technicians, ECISD Warehouse Supervisor

Evidence: Inventory records of deleted items.

Comments:

LRPT Correlates: I07

Goal 7: Provide robust Internet access and LAN/WAN services to students and staff.

Objective 7.1: Upgrade Internet and WAN bandwidth.

Budget for this objective: $171,666.00

LRPT Category: Infrastructure for Technology

E-Rate Correlates: ER01

NCLB Correlates: 05

Strategy 7.1.1: Upgrade existing Internet connection from 6 MB to 15 MB.

State: Original

Status: In Progress

Timeline: By September 30, 2007

Person(s) Responsible: Associate Superintendent for Business and Finance, Network Engineer, Technology Operations Manager

Evidence: 15 MB circuit in place.

Comments:

LRPT Correlates: I01, I02, I03, I06, I09

Strategy 7.1.2: Install Customize Switched Metro Ethernet system to increase WAN connections 1.54 MB to 100 MB.

State: Original

Status: In Progress

Timeline: By January 30, 2008

Person(s) Responsible: Network Engineer, Technology Operations Manager

Evidence: CSME installed and operating successfully.

Comments:

LRPT Correlates: I01, I03, I05, I06

Objective 7.2: Upgrade existing network switches, routers and classroom network drops.

Budget for this objective: $27,304.96

LRPT Category: Infrastructure for Technology

E-Rate Correlates: ER01

NCLB Correlates: 05

Strategy 7.2.1: Update status reports for all district network hardware.

State: Original

Status: In Progress

Timeline: By July 31, 2008

Person(s) Responsible: Network Engineer

Evidence: Written report.

Comments:

LRPT Correlates: I01, I06, I09

Strategy 7.2.2: Purchase and install additional network hardware.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Network Engineer

Evidence: Purchase orders, work logs.

Comments:

LRPT Correlates: I01, I06, I09

Strategy 7.2.3: Install additional network drops in each classroom.

State: Original

Status: In Progress

Timeline: On-going: August, 2007 - July, 2008

Person(s) Responsible: Network Engineer

Evidence: Orders, work logs.

Comments:

LRPT Correlates: I01, I06, I09

Objective 7.3: Establish and support a disaster recovery program for all district electronic data.

Budget for this objective: $10,000.00

LRPT Category: Leadership, Administration and Support

E-Rate Correlates: ER01 ER02

NCLB Correlates:

Strategy 7.3.1: Assess the district's current capacity to recover all electronic data.

State: Original

Status: In Progress

Timeline: August, 2007

Person(s) Responsible: Technology Operations Manager, Network Engineer

Evidence: Written plan

Comments:

LRPT Correlates: LAS14

Strategy 7.3.2: Develop and implement a comprehensive plan for recovery of all district electronic data.

State: Original

Status: In Progress

Timeline: By September, 2007

Person(s) Responsible: Technology Operations Manager, Network Engineer

Evidence: Documentation of disaster recovery plan.

Comments: The plan will include all hardware, software and staffing needs.

LRPT Correlates: LAS14

BUDGET

Total amount of Title II, Part D formula funds received for the current year of this plan: $23,720.00

Method of application for formula funds: Local Application

Budget for year 2007

- Telecom cost: $171,666.00

- Telecom source: Local 29%

ERate 71%

- Materials cost: $111,351.00

- Materials source: Local 46%

State Allotment 48%

Title II, Part D 6%

- Equipment cost: $417,870.00

- Equipment source: Local 36%

State Allotment 41%

Title II, Part D 3%

Other Federal 20%

- Maintenance cost: $163,230.00

- Maintenance source: Local 100%

- Staff development cost: $222,013.00

- Staff development source: Local 94%

Title II, Part D 6%

- Miscellaneous cost: $8,840.00

- Miscellaneous source: Local 99%

Title II, Part D 1%

- Total: $1,094,970.00

EVALUATION

Evaluation Process:

The East Central Technology Plan for 2007-2008 will be reviewed at least quarterly at regularly-scheduled meetings for the Technology Advisory Committee.

The technology staff will be responsible for ensuring completion of individual items in the plan, and will monitor every aspect of its implementation on an ongoing basis.

Progress reports will be disseminated at regular staff meetings with district instructional supervisors and curriculum directors in addition to being summarized on district web pages.

Updates to the plan will be done as needed, based on review of the progress in implementing each strategy.

Evaluation Method:

The extent to which we are successful in integrating technology into the curriculum will be assessed primarily through classroom observation and surveys of both teachers and students.

Teachers will be surveyed to determine the extent to which strategies included in the technology plan have increased their ability to help students reach challenging state academic standards. State assessment results will be monitored as they relate to strategies in several areas of the plan. Students enrolled in the ECHS Digital Campus will be followed each year until graduation. Their test results will be compared with students in the regular program.

The extent to which enhanced telecommunications services have been acquired and how will timelines have been met will be monitored through standard time/effort logs and activity reports. APPENDIX

Attachment item A:

ECISD Acceptable Use Policy

PDF

Attachment item B:

Sample of classroom/department web page.

Attachment item C:

Sample on-line learning unit.