Memorial Day 2015 Workparty

People:

    - Friday

        Jason, Adrian, Courtney, Caitlin, Kyle, Chris, Joe

        Jeep, Escalade, Truck

    - Saturday

        (Ray + 3 x CSF) - 

        Possibly: Astr101 - 3 students

        Kristina + Tiernan

   - Unknown's

     - Ben

     - Logan 

  

Tools:

    - Joe's drill already at MRO

    - Joes sawzall

    - picks

    - shovels

    - Cement mixer, picked up @ Central Rentals

    - Cement vibrator

    - Wheelbarrow

    - jigsaw and blades (for sink cabinet)

    - miter box and saw for trim strips--not sure if we need to do that this time...)

Supplies:

    - Cement, 134x 60-pound bags

    - Gutters

    - rebar = 51 x ft

    - 2in pvc pipe

    - 2 in couplers

    - 2 in Pvc ball valve

    - ss ball valve

    - 4in pvc tube 

    - ss handle assembly prebuilt at uw

    - 1.5in T at least 17

    - buckets

    - tarps

    - sink trap + supplies for hooking to sewer (trap w/ drain plug?)

Food:

    Friday Evening - Sandwiches (grilled)

    Saturday:

        Cereal / Fruit

        CSF picnic, awesome spread TBD

        brats

    Sunday

        Cereal / Fruit

        Sandwiches

        ???

    Monday

        Leftovers???

TODO:

tank interconnect

need coupler to finish water line

plumb transfer line

tank sumps

bulkheads

lags for foot pump

weather boxes for 1.5" electical conduit - http://www.homedepot.com/p/Cantex-1-1-2-in-Service-Entrance-Cap-R5133695/202043417?N=5yc1vZbohkZ1z1131uZ1z113es

t's for electical conduit

Permanently mount temperature sensors in building.  Setup Raspberry Pi to collect data from the Arduino.

Interior prep for summer

Friday:

    - Joe and Jason drive up with Ben, Logan, and Kyle

    - Stop at Home Depot and get sink sewage plumbing piping and as much gutter material as possible

    - piping/gutters 

    - Pick up cement in Ellensburg, at least 1/2 of cement

    - Gear and overnight bags can go in Jason's vehicle.

    - Interior jobs (this is the complete list--but of course not everything has to get done this trip):

Saturday:

    - Joe pick up cement

    - Jason & Joe makes run to pick up students/get the rest of the cement

    - LOA drives up with CSF people, possibly rest of student volunteers

    - CSF picnic with volunteers and faculty midday

    Joe + Jason + 4:

        - Place cement forms for piers

        - Place final transfer line

        - Backfill transfer line trench

     Jason + at least 4:

        - Pour cement, place mounts for panels

     Joe + 2: 

        - Mix cement

    Remaining volunteers:

        - Finish interior

Sunday:

    - Finishing work on piers/transfer plumbing

    - Place conduit, backfill

    - If time allows, hang some downspouts for gutters

Monday:

    - Joe returns cement mixer (Central Rental is closed on Sundays)

    - Joe and Jason drop off trash at transfer station

Video:

    Joe would like to interview every one individually and in a round table type discussion on sunday.  This should take 15 minutes / person during the day and an hour during the night.