Memorial Day 2015 Workparty
People:
- Friday
Jason, Adrian, Courtney, Caitlin, Kyle, Chris, Joe
Jeep, Escalade, Truck
- Saturday
(Ray + 3 x CSF) -
Possibly: Astr101 - 3 students
Kristina + Tiernan
- Unknown's
- Ben
- Logan
Tools:
- Joe's drill already at MRO
- Joes sawzall
- picks
- shovels
- Cement mixer, picked up @ Central Rentals
- Cement vibrator
- Wheelbarrow
- jigsaw and blades (for sink cabinet)
- miter box and saw for trim strips--not sure if we need to do that this time...)
Supplies:
- Cement, 134x 60-pound bags
- Gutters
- rebar = 51 x ft
- 2in pvc pipe
- 2 in couplers
- 2 in Pvc ball valve
- ss ball valve
- 4in pvc tube
- ss handle assembly prebuilt at uw
- 1.5in T at least 17
- buckets
- tarps
- sink trap + supplies for hooking to sewer (trap w/ drain plug?)
Food:
Friday Evening - Sandwiches (grilled)
Saturday:
Cereal / Fruit
CSF picnic, awesome spread TBD
brats
Sunday
Cereal / Fruit
Sandwiches
???
Monday
Leftovers???
TODO:
tank interconnect
need coupler to finish water line
plumb transfer line
tank sumps
bulkheads
lags for foot pump
weather boxes for 1.5" electical conduit - http://www.homedepot.com/p/Cantex-1-1-2-in-Service-Entrance-Cap-R5133695/202043417?N=5yc1vZbohkZ1z1131uZ1z113es
t's for electical conduit
Permanently mount temperature sensors in building. Setup Raspberry Pi to collect data from the Arduino.
Interior prep for summer
Friday:
- Joe and Jason drive up with Ben, Logan, and Kyle
- Stop at Home Depot and get sink sewage plumbing piping and as much gutter material as possible
- piping/gutters
- Pick up cement in Ellensburg, at least 1/2 of cement
- Gear and overnight bags can go in Jason's vehicle.
- Interior jobs (this is the complete list--but of course not everything has to get done this trip):
install footpump / plumb sink
install last light fixture in day room
oil countertop (if water doesn't bead on the surface rub a bit more butcherblock oil on--oil is in a plastic bag in kitchen area)
Fill holes in control room left by lamps (Oliver hasn't found electrical box covers that'll fit yet...)
paint trim strips,
install trim strips around countertop and above cabinets w/ finishing nails
paint touch up in kitchen, control room, baths
tag as much of the old garbage stuff as possible to make space.
Saturday:
- Joe pick up cement
- Jason & Joe makes run to pick up students/get the rest of the cement
- LOA drives up with CSF people, possibly rest of student volunteers
- CSF picnic with volunteers and faculty midday
Joe + Jason + 4:
- Place cement forms for piers
- Place final transfer line
- Backfill transfer line trench
Jason + at least 4:
- Pour cement, place mounts for panels
Joe + 2:
- Mix cement
Remaining volunteers:
- Finish interior
Sunday:
- Finishing work on piers/transfer plumbing
- Place conduit, backfill
- If time allows, hang some downspouts for gutters
Monday:
- Joe returns cement mixer (Central Rental is closed on Sundays)
- Joe and Jason drop off trash at transfer station
Video:
Joe would like to interview every one individually and in a round table type discussion on sunday. This should take 15 minutes / person during the day and an hour during the night.