Oct 26-27, 2018

Post date: Oct 27, 2018 7:12:14 PM

Arrived Fri evening, quickly followed by EvCC group. Spend most of the trip working on rain water catchment plumbing and network reconfiguration. Built and installed rain water catchment manifold to allow multiple inlets with outlet to Wallerstein and drain line. Will need to complete plumbing install next trip. Need the following supplies:

1" Poly Elbows (2 min)

1" Galvanized Elbow (1)

1" short nipple (2)

Sump Pump???

Need to complete tank lids.

Facility Status:

Inside Tank = 20 in

Blue jugs = 4

Heimdall is now running on a new OS, but telescope drivers are not yet installed, so no observing for you!

Dome paddle electronics are unplugged for the time being.

Food on hand: 8 eggs, butter (a lot of it)