April 18th 2015 Workparty
Joe + Jason + 4:
- Excavate South side
- Excavate North side for transfer tanks
- trench transfer line
- unearth septic
Jason + 2:
- Install Tanks and start plumbing
Joe + 2:
- Clean trenches
- Lay conduit
Sunday:
- Finishing work on kitchen
- Oliver and students return to Seattle
Monday:
- Joe returns excavator (Central Rental is closed on Sundays)
Video:
Joe would like to interview every one individually and in a round table type discussion on sunday. This should take 15 minutes / person during the day and an hour during the night.
questions:
- what is you role in the project
- how did you get involved with mro
- how has Mro shaped you education / career
- in forty years Mro has seen many changes, what do you expect Mro to look like in another 40 years, 2032?
- what impact do you see this project having on the education of students and the culture of that education?
- If any, what changes would you like to see to further decrease the environmental footprint of the telescope? do any of these align with increased telescope performance?
- Measure for bathroom cart
- touch up paint in bathrooms
- zero add headers
- try out dim lamp in control room
People:
- Jason+Ben+Kyle+Caitlin
- Oliver + Nadia, Paul, Eric, Kobe+Jory
- Joe
Supplies:
Joe will bring:
Range
Fridge
2 x tanks
webcam
Telemetry Viewer
chain saw blade sharpener
shovels
circular saw
jig saw
Jason will bring:
kitchen boxes
foot pump
downspout course filter
filters
2 x sump pump
thermostats
light paint - if we are painting at MRO make sure to let the undergrads know about overspray
Oliver will bring:
light fixtures
led bulb paint
painting supplies for behind toilet
hacksaw for metal rail
work light
brats
Food:
Friday Evening - probably subway - Sandwiches (grilled) - sourdough and / or multi grain, chicken and / or beef with pastrami, lettuce, onions, tomatoes, mustard
Saturday:
Cereal / Fruit - kashi multi grain, milk, apples
Sandwiches (grilled) - see above
brats - beef from owens (Oliver), chicken for Joe, onions, bell peppers, fingerling potatoes, salad + dressing
Sunday
Cereal / Fruit - see above
Sandwiches - see above
Chicken - thighs, brussel sprouts, potatoes, salad + dressing
Other: Coffee (the good stuff) + french press, creamer,
Friday:
Joe leaves early with truck and trailer
Jason drive up with Ben, Caitlin, and Kyle at 3:30
Jason & Joe meet at Issaquah Home Depot @ 4:30pm.
Gear and overnight bags can go in Jason's vehicle.
Drywall work
Paint Kitchen
Survey the excavation sites and mark
Home Depot
drywall patch
primer
ratcheting straps
Wire Conduit, include radio antennae runs
LED bulbs
14 40 Watt soft-white bulbs
10ish 60 Watt soft-white bulbs
2 GFCIs & cover plates, white
old-work box
8 "Sureslide" dimmers, w/ indicator lights, white
8 "toggler" dimmers, white
8 switch plates to fit toggle+decora (one small and one big hole), white
Short (3 step) stepladder. Oliver has been thinking that this would be useful for the downstairs room for awhile, and it'll be really useful as we do the lights and kitchen tomorrow. I just bought an Ikea stepstool for the kitchen, but I still think we could use something a little taller--thus, 3-steps.
Polyurethane silicone caulk for sealing the cut edge of the butcherblock under the sink--recommended by Ikea. A small tube will be just fine.
Saturday:
- Take down load of garbage to transfer station 1001 S Industrial Way , Ellensburg, WA 98926. have to take door off fridge.
- Joe pick up excavator.
- Knudsens
Concrete Forms (whatever can fit, need x19)
10 x 2x4's for securing forms
- Oliver buys brats
Oliver + 2:
- Install Light Fixtures: heat shrink cut end of lamp wire...
- Install cabinet frames
- rewire floor lamp