Sept. 20-22 Trip

Post date: Sep 22, 2019 3:13:19 PM

Who: Andi, Maria, Matt, Oliver, Teagan

What was done: we reinforced the deck and built a bench + railing. Will finish reinforcing things next time??? Things need to be sanded down and painted (springtime job). Note- some boards were detached and are just laying out on the deck. Andi and Oliver went down on Sat. morning, rest left on Sun morning.

Groceries

Freezer-

Fridge- plus eggs that are not depicted here, as well as a cucumber and some miscellaneous items.

Water: 1 blue jug, water tank at 22", Wallerstein at 56" at departure.

Need: new sink strainer, kitchen garbage bags, bbq scrubby, usb charging blocks (they seemed to have disappeared, as noted by Matt), paper cups.