Pipe Repairs

Post date: Jul 16, 2015 1:33:31 PM

During the CBIA July 2015 Meeting, a concern raised over how the drain pipe between Bay and Oliver Street on the beach has gotten bigger over the winter. Concern was over safety especially in high tide when the pipe is underwater.

The town did come and put cement in the gaps. Below are some "after" pictures.