Cove Street Sewer Project

Post date: Jun 10, 2015 5:43:06 PM

Cove Street is having sewer installed starting Monday June 8 through September. Residents of Cove Street have been asked not to walk on Cove Street for pleasure purposes during the construction period which is scheduled to run through September. The road will often times be blocked off due to the movement of the construction equipment and will be a dangerous place to be. There will be an increase in the volume of traffic using Crescent Beach and Point Connett roads as well as Cove Street. The traffic will consist of heavy construction equipment, loaders, excavators and commercial trucks. Cove Street is a popular place for many people to walk their dogs as well. This summer would be a good opportunity for everyone to explore new places to walk.