3.30 Issue or Deficiency Copy
Check the box on the left side of the Issue/s you want to Copy.
Select the Copy button.
3. The Copy Deficiency pop-up window has two options, Equipment Level and Project Level
Equipment Level - allows you to copy a Deficiency to a specific piece of equipment
Project Level - allows you to copy a Deficiency to the Project Level, not assigned to a piece of equipment